DETAIL KOLEKSI

Perencanaan sistem plambing di Apartemen Tunjungan Plaza, Surabaya

2.5


Oleh : Sarah Meilani

Info Katalog

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2017

Pembimbing 1 : Ratnaningsih

Pembimbing 2 : Ariani Dwi Astuti

Subyek : Plumsing system;Planning of plumbing;Water supply

Kata Kunci : water supply, waste water, rain water, investment cost

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2017_TA_TL_08212050_Halaman-judul.pdf
2. 2017_TA_TL_08212050_Bab-1.pdf 2
3. 2017_TA_TL_08212050_Bab-2.pdf
4. 2017_TA_TL_08212050_Bab-3.pdf
5. 2017_TA_TL_08212050_Bab-4.pdf
6. 2017_TA_TL_08212050_Bab-5.pdf
7. 2017_TA_TL_08212050_Bab-6.pdf
8. 2017_TA_TL_08212050_Bab-7.pdf
9. 2017_TA_TL_08212050_Daftar-pustaka.pdf
10. 2017_TA_TL_08212050_Lampiran.pdf

A Apartemen Tunjungan Plaza berlokasi di Jalan Basuki Rahmat, Kota Surabaya dan dibangun di atas lahan seluas 4520 m2 yang terdiri dari mall, kantor, dan apartemen dengan total lantai sebanyak 36 lantai. Mall terdiri dari 4 lantai, kantor terdiri dari 9 lantai, dan apartemen terdiri dari 20 lantai. Tinggi bangunan apartemen ini adalah 167,6 m dengan total hunian sebanyak 221 unit. Sistem penyediaan air bersih yang diterapkan adalah sistem tangki atap dan mendistribusikan air secara gravitasi. Direncanakan juga sistem air daur ulang dari air buangan yang dimanfaatkan kembali untuk flushing kloset tangki gelontor dan siram taman. Jumlah kebutuhan air bersih adalah 269 m3/hari dan kebutuhan air daur ulang adalah 44 m3/hari dengan kapasitas reservoir bawah air bersih 564,54 m3 dan kapasitas reservoir bawah air daur ulang adalah 62 m3. Pemompaan menuju reservoir atas yaitu selama 12 jam dengan pompa transfer dan kapasitas reservoir atas adalah 112 m3 sedangkan untuk air daur ulang adalah 23 m3. 2 pipa tegak dibutuhkan untuk air bersih dan 2 pipa tegak untuk air daur ulang. PRV pada pipa tegak dipasang di lantai 26, 19, 10 dan lantai 1. Perhitungan fluktuasi pemakaian air bersih menggunakan apartemen Merr sebagai pembanding dengan kriteria yang sama dengan apartemen yang direncanakan. Air buangan menggunakan sistem terpisah antara air bekas dan air kotor. Air buangan salurkan ke STP untuk diolah. Air buangan yang sudah di daur ulang dimanfaatkan kembali untuk flushing kloset tangki gelontor dan siram taman. Air hujan disalurkan melalui talang atap berdiameter 89 mm dan 114 mm dan pipa tegak berdiameter 60 mm dan 89 mm. Air hujan tersebut disalurkan menuju sumur resapan yang direncanakan berjumlah 1 buah. Biaya investasi dan konstruksi peralatan plambing Apartemen Tunjungan Plaza sebesar Rp 2,157,697,501,- dengan biaya penyediaan air bersih per unit Rp 4,445,643,- dan untuk penyaluran air buangan sebesar Rp 1,070,711,-.

T Tunjungan Plaza Apartment is located at Jalan Jalan Basuki Rahmat, Surabaya City and it’s built on an area 4520 m2 which is consist of mall, office, and apartments with total the floor about 36 floor . Mall consists of 4 floors, the office consists of 9 floors and apartment consists of 20 floors. The height of Apartment is 167,6 m with the total amount of residential is 221 units. Water supply system that applied to this apartment is roof tank system so the water distributed by gravity. Also designed recycle water system from waste water so can be reuse for flushing of water closet and watering plants. It is needs 269 m3/day for clean water and 44 m3/day for recycle water with the capacity of ground water tank clean water is 564,54 m3 and ground water tank recycle water is 62 m3. Transfer pumps works for 12 hour/day and the capacity for clean water roof tank is 112 m3 whereas for recycle water roof tank is 23 m3. 2 stand pipes needed for clean water and 2 stand pipes for recycle water. PRV on stand pipes mounted in the floor 26th, 19th, 10th floor to 1st floor. Calculation of water consumption’s fluctuations using Merr Apartment as comparison with the same criteria as the designed apartments. Waste water used separated system between grey water and black water. Both of grey water and black distributed to STP to be treated. Waste water that has been recycled reuse for flushing water closet and watering plants. Rain water delivery through gutter 89 mm and 114 mm and standpipes diameter 60 mm and 89 mm. Rain water went to infiltration well by gravity which designed 1 well. Total amount of investment and constructions of plumbing equipment is Rp 2,157,697,501,- with cost of water supply per unit Rp 4,445,643,- meanwhile cost waste water piping per units is Rp 1,070,711,-.

Bagaimana Anda menilai Koleksi ini ?