DETAIL KOLEKSI

Usulan perbaikan tata letak ruang produksi di CV. Mulia

3.3


Oleh : Andy Maulana

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2004

Pembimbing 1 : Dorina Hetharia

Pembimbing 2 : Iveline Anne Marie

Subyek : Plant layout;Production management;Material handling

Kata Kunci : CV . Mulia, production floor, production control, quality control, process control, material handlin

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2004_TA_TI_06397019_Halaman-Judul.pdf
2. 2004_TA_TI_06397019_Bab-1.pdf
3. 2004_TA_TI_06397019_Bab-2.pdf
4. 2004_TA_TI_06397019_Bab-3.pdf
5. 2004_TA_TI_06397019_Bab-4.pdf
6. 2004_TA_TI_06397019_Bab-5.pdf
7. 2004_TA_TI_06397019_Bab-6.pdf
8. 2004_TA_TI_06397019_Daftar-Pustaka.pdf
9. 2004_TA_TI_06397019_Lampiran.pdf

C CV . Mulia merupakan salah satu perusahaan di Indonesia yang memproduksi sepatu dan sandal perlu menjaga target produksinya agar tetap tercapai. Salah satu yang dapat menghalangi target produksi tercapai adalah tata letak produksi yang ada di perusahaan ini belum terencana dengan baik. Sehingga untuk memenuhi kebutuhan target produksi saat ini, peru sahaan perlu melakukan re-layout .Untuk itu dilakukan pembuatan Peta Proses Operasi yang dilanjutkan perhitungan waktu baku , perhitungan lembar pengurutan produksi (Routing Sheet) untuk menghitung jumlah kebutuhan mesin, perhitungan kebutuhan luas lantai produksi dan perhitungan Material Handling Planning Sheet serta From To Chart Biaya. Berdasarkan From To Chart Biaya yang dibuat, kemudian dilakukan perancangan tata letak produksi dengan membuat From To Chart Inflow, From To Chart Outflow , Activity Relationship Diagram dan Area Allocation Diagram lantai produksi .Hasil perancangan ulang (re-layout) tata letak lantai produk si membutuhkan perhitungan kebutuhan luas area sebesar 1114.92 m2 dengan pengurangan sejumlah 20 mesin, dengan biaya Material Handling sebesar Rp. 1.001.657,71

C CV. Mulia is one of the companies in Indonesia that produce shoes and sandals need to maintain its production. One that can prevent to achieve target production is that the layout production in this company not well plan enough . So, to fulfill the need of now target production, company need to do relayout.For th i., need to make Operation Process Chart and continue to count the Cycle Time, calculation of Routing Sheet to get the amount needs of machines, calculation need for space production layout, calculation of Material Handling Planning Sheet and From To Chart of Cost.From the From To Chart Cost that been made, then continue making the layout design by making the From To Chart Inflow, From To Chart Outflow, Activity Relationship Diagram and Area Allocation Diagram production floor.Result from the layout of the production floor need space 1114.92 m2, with reducing to 20 machine s, with Material Handling cost Rp. 1.001.657,71

Bagaimana Anda menilai Koleksi ini ?