Analisis keekonomian penambahan kompresor pada pengembangan lapangan AST di Lepas Pantai Utara Jawa Barat


Oleh : Perwira Handhiko

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Syamsul Irham

Subyek : Cash flow parameters;Fiscal terms

Kata Kunci : mobile offshore production unit, the incremental production, economic calculation

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07111274_Halaman-Judul.pdf 17
2. 2016_TA_TM_07111274_Bab-1.pdf
3. 2016_TA_TM_07111274_Bab-2.pdf
4. 2016_TA_TM_07111274_Bab-3.pdf
5. 2016_TA_TM_07111274_Bab-4.pdf
6. 2016_TA_TM_07111274_Bab-5.pdf
7. 2016_TA_TM_07111274_Daftar-pustaka.pdf
8. 2016_TA_TM_07111274_Lampiran.pdf

S Salah satu indikator keberhasilan suatu bisnis migas adalah baiknya atauefisiennya pemilihan pengembangan lapangan migas . Pengembangan lapanganmigas ini sangat penting dikarenakan dengan manajemen pengembangan yangbaik maka akan menghasilkan suatu lapangan migas yang ekonomis dan efisien. Pada lapangan AST akan dilakukan pengembangan lapangan.Pengembangan ni dilakukan karena produksi gas yang terus menurunserta decline yang sudah sangat tajam.Tujuan dari pengembangan ini adalah untuk menaikkan dan mempertahankan rate produksi selama beberapa tahun.Untuk menaikkanan mempertahankan rate produksi tersebut, dilakukan pemasangan pompa kompresor.Skenario pemasangan pompa kompresor dibagi menjadi 4 skenario.Skenario pertama adalah skenario pemasangan onshore sewa kompresor, skenario kedua onshore beli kompresor, skenario ketiga offshore fixed platform, serta skenario keempat offshore sewa mobile offshore production unit (MOPU). Perhitungan tiap skenario berdasarkan incremental (penambahan) produksi.Setalah itu dilakukan perhitungan keekonomian yang berdasrkan pada enam indikator yaitu NPV,ROR,POT,PIR,DPIR,Net kontraktor,Net pemerintah.Setelah dilakukan perhitungaan keekonomian dilakukan analisa sensitivitas bedasarpada biaya capital,biaya operasi,harga gas dan produksi.Setelah dilakukan perhitungan keekonomian dan analisasensitivitas,dipilih Skenario onshore sewa kompresor dengan nilai NPV $ 106,69juta , ROR 76,8 %,POT 1,1 tahun, net kontraktor $ 245 juta,dan net pemerintah $ 206,5 juta , dan nilai PIR sebesar 3,25.

O One indicator of the success of the oil and gas business which is good or efficient electoral oil and gas field development. Development of oil and gas field is very important due to the good development management will produce an oil field that is economical and efficient. On the field AST will be develop. This development will develop because gas production is declining and the decline has been very sharp. Main purpose of this development is to increase and maintain production rates for several years. For increase maintain theproduction rate, do the installation of the compressor pump. Compressor Scenario pump installation is divided into 4 scenario. Scenario first deployment scenarios onshore compressor rental, the second scenario onshore buy compressor, the third scenario offshore fixed platforms, as well as the fourth scenario offshore lease mobile offshore production unit (MOPU). Calculation of each scenario based on the incremental production (additional). After that the economic calculation is done based on those on six indicators: NPV, ROR, POT, PIR, DPIR, Net contractor, Net Goverment. After economies calculation performed a sensitivity analysis based on capital costs, operating costs , the price of gas and production. After calculation of the economic and sensitivity analysis,The selected scenario is onshore compressor rental with NPV value of $ 106,69 million, 76,8% ROR, POT 1,1 years, net contractor $ 245 million, and net the government $ 206,5 million , and value of PIR 3,25.