Perencanaan instalasi pipa sistem plambing pada gedung perkantoran sequis tower


Oleh : Zainal Mubarok

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Husein

Subyek : Plumbing

Kata Kunci : plumbing, roof tank, pump, GWR

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_STM_061001400034_Halaman-Judul.pdf 18
2. 2018_TA_STM_061001400034_Lembar-Pengesahan.pdf 3
3. 2018_TA_STM_061001400034_Bab-1_Pendahuluan.pdf 3
4. 2018_TA_STM_061001400034_Bab-2_Tinjauan-Pustaka.pdf
5. 2018_TA_STM_061001400034_Bab-3_Metodologi-Penelitian.pdf
6. 2018_TA_STM_061001400034_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2018_TA_STM_061001400034_Bab-5_Kesimpulan.pdf
8. 2018_TA_STM_061001400034_Daftar-Pustaka.pdf 2
9. 2018_TA_STM_061001400034_Lampiran.pdf

P Pada pembangunan bangunan tinggi diperlukan sistem plambing yang digunakan untuk menunjang kebutuhan sehari-hari pada bangunan tinggi tersebut.Sistem plambing digunakan untuk menyuplai air bersih ke setiap plambing fixtures,dan mengalirkan air kotoran serta air buangan ke septic tank. Dalam memenuhikebutuhan air bersih pada gedung Sequis Tower dengan jumlah pengguna gedungsebanyak 10.440 orang diperlukan air bersih sebesar 209 m3/hari. Kapasitas GWRsebesar 277 m3 dimana GWR digunakan sebagai tempat penampungan air bersihuntuk pengguna gedung dan untuk kebutuhan pencegahan dan penanggulangankebakaran. Pada perencanaan ini dibagi menjadi 2 zona, dimana roof tank untuk zona1 berada di lantai 20 dengan kapasitas sebesar 16 m3. Sedangkan roof tank untukzona 2 berada di lantai 38 dengan kapasitas sebesar 14 m3. Roof tank pada lantai 20digunakan untuk memenuhi kebutuhan air untuk 21 lantai dibawahnya, sedangkanroof tank pada lantai 38 digunakan untuk memenuhi kebutuhan air untuk 18 lantaidibawahnya. Untuk mengalirkan air dari GWR ke roof tank lantai 20 dan dari rooftank lantai 20 ke roof tank lantai 38 digunakan pompa transfer dengan kapasitasmasing-masing sebesar 1 m3/menit dan 0,9 m3/menit. Head pompa pada GWR danhead pompa pada lantai 20 sebesar 125 m dan 100 m. Sistem pendistribusian airbersih dilakukan dengan cara gravitasi dimulai dari 4 lantai dibawah roof tank sampailantai dasar. Sedangkan 3 lantai dibawah roof tank menggunakan peralatan tambahanberupa pompa booster.

I In the high building construction, the plumbing system is needed due tomaintain and support the daily needs of its users. The plumbing system is used tosupply clean water to every fixtures, as well as draining the dirt and waste water intothe septic tank. In terms to fulfill the needs of clean water, The Sequis Tower withtotal of 10.440 users needs 209 m3/day of clean water. The total capacity of GWR is277 m3 where it was used to store the clean water. This clean water can be used forthe building users and for the needs of fire extinguisher system. In the design ofSequis Tower, the roof tank was divided by two zone. Zone 1 was located in thetwentieth floor with the capacity of 16 m3. Where the zone 2 was located in thirtyeighthfloor with the capacity of 14 m3. The zone 1 roof tank was used to accomodatethe needs of clean water for twenty first floor belows it. The zone 2 was used foreighteenth floor belows it. The transfer pump is used to carry the water from GWRto the zone 1 and zone 2 roof tank. The capacity of the transfer pump to zone 1 is 1m3/minute while for zone 2 is 0,9 m3/minute. The head pump in GWR is 125 m andthe head pump in zone 2 is 100 m. The distribution of clean water is done by usinggravitational system starting from the fourth floor belows the roof tank to the ground.The booster pump was needed for the third floor belows