DETAIL KOLEKSI

Rancangan saluran terbuka pada area yang terkena longsoran di Bukit Kaliwadas, Karangsambung,Kebumen, Jawa Tengah


Oleh : Galang Ramadhan

Info Katalog

Nomor Panggil : 568/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Reza Aryanto

Pembimbing 2 : Taat Tri Purwiyono

Subyek : Mining - Geology and stratigraphy;River design

Kata Kunci : manning equation, channel dimension design

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TB_073001400043_Halaman-Judul.pdf 17
2. 2018_TA_TB_073001400043_Bab-1.pdf
3. 2018_TA_TB_073001400043_Bab-2.pdf
4. 2018_TA_TB_073001400043_Bab-3.pdf
5. 2018_TA_TB_073001400043_Bab-4.pdf
6. 2018_TA_TB_073001400043_Bab-5.pdf
7. 2018_TA_TB_073001400043_Daftar-Pustaka.pdf
8. 2018_TA_TB_073001400043_Lampiran.pdf

I Indonesia adalah negara yang memiliki iklim tropis. Negara yang memilikiiklim tropis hanya memiliki dua musim yaitu musim hujan dan musim kemarau.Pada musim hujan, muka air (air tanah dan air permukaan) suatu daerah akanmeningkat. Peningkatan muka air tanah dapat menyebabkan bencana, salahsatunya adalah longsor. Akibat dari longsoran adalah material yang terbawa padasaat longsor dapat menimbulkan masalah baru seperti yang terjadi di BukitKaliwadas, Karangsambung, Kebumen, Jawa Tengah. Material yang terbawa olehlongsoran menutupi saluran irigasi sehingga perlu rancangan ulang agar saluranirigasi dapat digunakan kembali. Dalam membuat rancangan saluran irigasi halyang perlu diperhatikan adalahcurah hujan, intensitas curah hujan, periode ulanghujan, area tangkapan hujan, dan bentuk serta dimensi saluran terbuka. Dalamperhitungan curah hujan di lokasi penelitian maka dihasilkan curah hujan sebesar683,67 mm, intensitas curah hujan sebesar 237,015 mm/jam, luas area tangkapanhujan sungai sebesar 252,95 m2, luas area tangkapan hujan luar sungai sebesar0,16 km2, debit air limpasan sebesar 2,128 m3/detik. Dari hasil perhitungan diatasdengan menggunakan persamaan Manning maka diperoleh rancangan dimensisungai seperti kedalaman penampang saluran sebesar 0,697 m dan lebarpermukaan saluran adalah sebesar 1,39 m.

I Indonesia is a country that has a tropical climate. Countries that have a tropicalclimate only have two seasons, rainy and dry seasons. In the rainy season, thewater level (ground water and surface water) of an area will increase. Anincrease in groundwater can cause disasters, one of which is a landslide. Theeffect of landslides is that material carried during landslides can cause newproblems such as those that occurred in Kaliwadas Hill, Karangsambung,Kebumen, Central Java. Materials carried by landslides cover the irrigationchannels so that they need to be redesigned so that the irrigation can be reused.When making the irrigation channel design, things that need to be considered arerainfall, rainfall intensity, rain return period, rain catchment area, and the shapeand dimensions of open channels. In the calculation of rainfall in the researchlocation, the resulting rainfall is 683.67 mm, rainfall intensity of 237.015 mm /hour, area of river rain catchment area of 252,95 m2, area of rainfall outside theriver of 0.16 km2, discharge runoff water of 2,128 m3/ second. From the results ofthe calculations above using the Manning equation, the design of river dimensionssuch as channel section depth is 0.697 m and the channel surface width is 1.394m.

Bagaimana Anda menilai Koleksi ini ?