DETAIL KOLEKSI

Perencanaan bangunan pengolahan air bersih Taman Margasatwa Ragunan


Oleh : Wahyu Widiyanningrom

Info Katalog

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2004

Pembimbing 1 : Ratnaningsih

Pembimbing 2 : Asih Wijayanti

Subyek : Water sanitation;Building - Water treatment

Kata Kunci : clean water instalation, Ragunan zoo

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2004_TA_TL_08297059_Halaman-Judul.pdf
2. 2004_TA_TL_08297059_Bab-1.pdf
3. 2004_TA_TL_08297059_Bab-2.pdf
4. 2004_TA_TL_08297059_Bab-3.pdf
5. 2004_TA_TL_08297059_Bab-5.pdf
6. 2004_TA_TL_08297059_Bab-6.pdf
7. 2004_TA_TL_08297059_Bab-7.pdf
8. 2004_TA_TL_08297059_Bab-8.pdf
9. 2004_TA_TL_08297059_Daftar-Pustaka.pdf
10. 2004_TA_TL_08297059_Lampiran.pdf

D Dalam rangka pengembangan untuk meningkatkan mutu dan pelayanan kepada masyarakat umum serta meningkatkan fungsi sebagai obyek konservasi, penelitian, pendidikan dan rekreasi, Taman Margasatwa Ragunan (TMR) Jakarta merencanakan pembangunan sebuah lnstalasi Pengolahan Air Bersih (IPA) dengan air baku berasal dari Waduk Filtrasi Ragunan.Metoda pelaksanaan penelitian kebutuhan air bersih di TMR dilakukan dengansurvei melalui pengisian kuesioner dan menganalisa kelayakan air baku. Metode terpilih yang digunakan untuk memproyeksikan jumlah pengunjung sampai akhir tahun perencanaan adalah Metode Goemetri.Kapasitas Bangunan Pengolahan Air Bersih direncanakan berdasarkan kebutuhan air bersih Taman Margasatwa Ragunan Jakarta sampai dengan akhir tahun perencanaan2011. Kebutuhan air bersih pada tahun 2011 mencapai 24 l/detik. Desinfektan yang akan digunakan adalah Natrium Hipklorit (NaOCl) cair dengan dosis 2.5mg/l. Unit-unit IPA dipilih berdasarkan hasil analisis terhadap kualitas air baku yang bersumber dari Waduk Filtrasi Ragunan yaitu : Tabel 1 Unit Instalasi Bangunan Pengolahan Air Bersih No. Unit unit Kapasitas Jumlah 1. Flotasi 24 l/detik 1 2. Filtrasi dengan 2 media 12 l/detik 2 3. Desinfeksi 24 l/detik 1 Total perhitungan anggaran biaya untuk keseluruhan pekerjaan pembangunan IPA adalah Rp. 82.166.411,00 ( delapan puluh dua juta seratus enam puluh enam ribu empat ratus sebelas rupiah).Untuk mencukupi kebutuhan air bersih di Taman Margasatwa Ragunan Jakarta,maka sebaiknya segera dibangun unit instalasi sesuai unit IPA yang terpilih, dan perlu dilakukan perawatan unit-unit IPA untuk menjaga estetika air bersih yang dihasilkan. Bagi para operator perlu diadakan pelatihan pengoperasian dan pemeliharaan instalasi IPA agar proses produksi air dapat terns berjalan dengan lancar.

I In the process of the developtment to increas the quality and the service to public society and to rise the function as a conservation object, reaserching, education, and recreation, Ragunan Zoo Jakarta is planning to build a water sanitation and filtration instalation, which the water will be taken from Ragunan Filtration Dam.The researching methode of the clean and fresh water need at Ragunan is done bysurveying through the questioner and also by analyzing the suitable of the water. The chosen methode which is used to predict the number of visitors untill the end of planning year is a Geometry Methode.The capacity of clean water instalation planned is based on the need of the freshand clean water of Ragunan Zoo untill the end of planning year of 2011. The need of clean water in the year of 2011 reaches 24 I/second. The desinfectant will be used is the liquid of Natrium Hipklorofit ( NaOCL ) with the doze 2.5 mg/I. The units of instalation is chosen based on the analysis to the quality of the water that comes from Ragunan Filtration Dam, which are : Tabel I The instalation unit of clean water processing building No The units number of capacity Jumlah 1 Flotation 241/ second 1 2 Filtration with 2 media ................ 12 I/ second 2 3. Des infection ....... 24 1/ second 1 The account of total finance of the clean water processing building is Rp.82.166.411,00 (eighty two million one thousand sixty six four hundred and eleven rupiahs).To fullfill all the need of clean water in Ragunan zoo, it should be better to build an instalation unit in rush, which is suitable according to the chosen unit of clean water instalation and is needed to do the treatment to the units of clean water instalation to keep the value of clean water which is resulted. To the operator, it is needed to held an operating and treatment exercises of clean water instalation in order to ensure the production process keeps running well.

Bagaimana Anda menilai Koleksi ini ?