DETAIL KOLEKSI

Penentuan nilai volume minyak awal di tempat menggunakan metode simulasi material balance dan material balance pada reservoir J Lapangan X


Oleh : Aditya Pratama Sutarman

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2013

Pembimbing 1 : Onnie Ridaliani

Pembimbing 2 : Samsol

Subyek : Material balance simulation method;Reservoir

Kata Kunci : material balance simulation method, oil in place, reservoir J, field X

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07110009_Halaman-judul.pdf
2. 2015_TA_TM_07110009_Bab-1.pdf
3. 2015_TA_TM_07110009_Bab-2.pdf
4. 2015_TA_TM_07110009_Bab-3.pdf
5. 2015_TA_TM_07110009_Bab-4.pdf
6. 2015_TA_TM_07110009_Bab-5.pdf
7. 2015_TA_TM_07110009_Daftar-pustaka.pdf
8. 2015_TA_TM_07110009_Lampiran.pdf

R eservoir J pada Lapangan X merupakan reservoir minyak tidak jenuh (under saturated). Oleh karena itu persamaan dari metode Material Balance yangdigunakan merupakan persamaan Material Balance untuk reservoir tidak jenuh(under saturated), yaitu menggunakan persamaan dari metode Havlena Odehdengan jenis tenaga dorong air (water drive). Pada perhitungan untuk jenis tenagaair ini menggunakan persamaan dari edge water drive dikarenakan pendorongminyak yang berasal dari aquifer melalui samping tidak secara vertikal.Pada penentuan jenis tenaga dorong ini pada Reservoir J Lapangan Xmenggunakan penentuan beberapa metode untuk mengetahui jenis tenaga dorongyang digunakan pada reservoir ini. Beberapa metode yang digunakan antara lainmetode J J Arps, metode Drive Index, dan metode simulasi Material Balance. Dimetode J J Arps menghitung nilai dari recovery factor (RF) sebesar 43%.Kemudian menggunakan metode Drive Index nilai dari WDI > SDI.Hasil perhitungan Original Oil In Place dengan menggunakan metodeMaterial Balance Garis Lurus di dapatkan melalui hasil plot antara nilai dari F/Eopada sumbu Y sedangkan We/Eo pada sumbu X pada grafik kartesian, nilaiOriginal Oil In Place sebesar 5,000,000 STB. Sedangkan hasil perhitunganmenggunakan metode simulasi Material Balance nilai Original Oil In Place didapatkan setelah hasil dari simulasi histroy matching pada software Mbal matchyaitu sebesar 5,400,000 STB.

R eservoir J on the field X is not saturated oil reservoir but under saturated.Therefore the equation of the Material Balance method used is the MaterialBalance equation for the reservoir does not saturate (under saturated), using theequations of the Odeh Havlena method is water drive. On the calculation for thistype of water drive using the equation of edge water drive because drivers of oilthat comes from an aquifer through the side not vertically.On the determination of the type of drive mechanism at Reservoir J Field X usingthe determination of several methods to find out the type of thrust power used onthis reservoir. Some of the methods used, among other methods, the method ofArps J Drive Index, and the Material Balance simulation method. On the methodof calculating the J Jarps method of the recovery factor (RF) is 43%. Then use thevalue of the Index Drive method and the result is WDI bigger than SDI.The results of the calculation of the Original Oil In Place by using the straight linemethod of Materials Balance in the get results through a plot between the value ofthe natural occurring F/Eo on Y axis between We/Eo on X axis on a graphCartesian, the value of the Original Oil In Place of 5,000 million STB. While theresults of the calculation of Material Balance simulation method using the valueof the Original Oil In Place in the get after the results of the simulation softwareon matching histroy Mbal match i.e. of 5,400 million STB.

Bagaimana Anda menilai Koleksi ini ?