DETAIL KOLEKSI

Desain dan evaluasi matrix acidizing Sumur A,B, dan C di Lapangan Y

5.0


Oleh : Brian Tony

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Rachmat Sudibyo

Pembimbing 2 : M.G Sriwahyuni

Subyek : Reservoir matrix acidizing;Evaluation of reservoir simulation

Kata Kunci : evaluation of reservoir simulation, reservoir matrix acidizing, field Y

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112045_Halaman-judul.pdf 26
2. 2016_TA_TM_07112045_Bab-1.pdf 2
3. 2016_TA_TM_07112045_Bab-2.pdf
4. 2016_TA_TM_07112045_Bab-3.pdf
5. 2016_TA_TM_07112045_Bab-4.pdf 44
6. 2016_TA_TM_07112045_Bab-5.pdf
7. 2016_TA_TM_07112045_Bab-6.pdf
8. 2016_TA_TM_07112045_Daftar-pustaka.pdf 3
9. 2016_TA_TM_07112045_Lampiran.pdf

R endahnya produktivitas Sumur A, Sumur B, dan Sumur C dapatditanggulangi dengan beberapa usaha, mulai dari penggantian electric submersiblepump (ESP) lama yang telah terjadi pengendapan scale dengan pompa ESP baru,sampai dengan matrix acidizing. Matrix aciding yang dilakukan pada Sumur A,Sumur B, dan Sumur C dilakukan dengan cara menginjeksikan fluida asam kedalam formasi dengan tekanan injeksi dibawah tekanan rekah formasinya, denganmemiliki tujuan agar asam dapat bereaksi menyebar ke formasi batuan secara radialsehingga dapat melarukan partikel-partikel yang menyumbat saluran pori-poridisekitar lubang sumur.Matrix acidizing pada Sumur A dilakukan pada tanggal 2 Juni 2015, SumurB dilakukan pada tanggal 5 Mei 2010, sedangkan Sumur C dilakukan pada tanggal26 Februari 2010. Material pengasaman matriks yang digunakan pada ketiga sumurini dengan bahan dasar asam yang sama yaitu asam HCl. Asam tersebutdiinjeksikan bertahap sesuai dengan urutan program stimulasi yang telah dibuat.Setelah tahap terakhir dilakukan, terbukti bahwa produksi Sumur A, Sumur B, danSumur C berhasil meningkat. Dan dari hasil perubahan tersebut dapat disimpulkanbahwa pekerjaan matrix acidizing yang dilakukan berhasil.

T he low degree of Well A, Well B, and Well C productivity can beaddressed by some ways, from replacing the old electric submersible pump (ESP)which had through scale precipitated into a new one, to matrix acidizing. Matrixacidizing which was applied to Well A, Well B, and Well C, was done by injectingfluid acid into their formation under their formation fracturing pressure. Throug thisway, the acids will spread into the rock formation radially, and so as the particelsthat are clog the pores around the sumur will be dissolved.The matrix acidizing was done in each Well; Well A on June, 2nd 2015,Sumur B on Mei, 5th 2010, and Sumur C on Februari, 26th 2010. The acid materialused on them has the same basic material, which is HCl. It was injected graduallybased on their stimulation program. After the last step, it was found that the levelproduction of Well A, Well B, and Well C were increased. Therefore, the matrixacidizing which is applied to them was also succeed.

Bagaimana Anda menilai Koleksi ini ?