DETAIL KOLEKSI

Evaluasi Hydraulic Fracturing pada Sumur DC-12 dan DC-15, Lapangan X


Oleh : Ario Putro Prakoso

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Djunaedi Agus Wibowo

Pembimbing 2 : Ratnayu Sitoresmi

Subyek : Hydraulic fracturing - Evaluation;W ell productivity

Kata Kunci : evaluation of hydraulic fracturing, permeability, DC-12 and DC-15 wells, Field X

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07111056_Halaman-judul.pdf 19
2. 2016_TA_TM_07111056_-Bab-1.pdf 2
3. 2016_TA_TM_07111056_-Bab-2.pdf
4. 2016_TA_TM_07111056_-Bab-3.pdf
5. 2016_TA_TM_07111056_-Bab-4.pdf
6. 2016_TA_TM_07111056_-Bab-5.pdf
7. 2016_TA_TM_07111056_-Bab-6.pdf
8. 2016_TA_TM_07111056_Daftar-pustaka.pdf 3
9. 2016_TA_TM_07111056_Lampiran.pdf

E valuasi Stimulasi Hydraulic Fracturing pada sumur DC-12 dan DC-15pada Lapangan X bertujuan untuk mengetahui berhasil atau tidaknya pekerjaan stimulasi tersebut. Stimulasi ini bertujuan untuk meningkatkan atau memperbaikiproduktivitas sumur yang mengalami penurunan produksi. Permeabilitas padasumur DC-12 dan DC-15 rata-rata sekitar 1 mD. Nilai skin pada sumur DC-12dan sumur DC-15 adalah +1.Parameter yang di evaluasi dari pekerjaan stimulasi tersebut, antara lainevaluasi geometri dan produksi. Pada Evaluasi tersebut, dilakukan analisisperbedaan antara hasil desain dengan hasil actual dilapanganPada evaluasi produksi, dilakukan perhitungan kenaikan laju produksi padasumur DC-12 dan DC-15 dengan metode Prats, McGuire-Sikora, dan MetodeCinco-Ley, Samaniego, dan Dominique. Menggunakan rumus-rumus diatas bisadidapatkan kenaikan kelipatan produksi sekitar 100%Secara analisis keekonomian melalui Pay Out Time (POT) di dapat angkasekitar 3 bulan dari masa awal produksiSecara keseluruhan, pekerjaan Hydraulic Fracturing pada sumur DC-12 danDC-15 dapat dikatakan berhasil, karena mengalami peningkatan sebesar 100%pada laju produksinya.

T he evaluation of Hydraulic Fracturing stimulation DC-12 and DC-15wells on a X field aims to understand the work of the success or failure of thestimulation.Stimulation is intended to improve productivity increase or decreaseproduction wells .the average of permeability of DC-12 and DC-15, is about 1md. The skin on DC-12 and DC-15 are + 1.The Parameter that evaluated are geometry and production evaluation. Inthese evaluation, conducted analyses of the differences between the result ofdesign with the actual in the field.On the evaluation of production, calculated the increase in the rate ofproduction on wells DC-12 and DC-15 with the method of Prats, McGuire-Sikora,and methods of Cinco-Ley, Samaniego, and Dominique. Using the formulasabove can be obtained production increase in multiples of approximately 100%In economic analysis through Pay Out Time (POT) gained approximately 3months the numbers of early production.As a whole, the work of hydraulic fracturing in well DC-12 and DC-15 canbe managed from the production side because it has increased about a 100% rateof production.

Bagaimana Anda menilai Koleksi ini ?