DETAIL KOLEKSI

Perencanaan sistem plambing The Times Square Residence Cibubur - Jakarta Timur


Oleh : Jasmine Natalia Prihartini

Info Katalog

Nomor Panggil : TA.TL.590

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2005

Pembimbing 1 : Ariani Dwi Astuti

Pembimbing 2 : Rositayanti Hadisoebroto

Subyek : Plumbing

Kata Kunci : Clean water supply, Piping dimension, Stack, Hidrofor, Reservoir

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2005_TA_TL_08299044_JUDUL.pdf
2. 2005_TA_TL_08299044_ABSTRAK.pdf
3. 2005_TA_TL_08299044_DAFTAR-ISI.pdf 5
4. 2005_TA_TL_08299044_BAB-I.pdf 3
5. 2005_TA_TL_08299044_BAB-II.pdf
6. 2005_TA_TL_08299044_BAB-III.pdf
7. 2005_TA_TL_08299044_BAB-IV.pdf
8. 2005_TA_TL_08299044_BAB-V.pdf
9. 2005_TA_TL_08299044_BAB-VI.pdf
10. 2005_TA_TL_08299044_BAB-VII.pdf
11. 2005_TA_TL_08299044_DAFTAR-PUSTAKA.pdf 1
12. 2005_TA_TL_08299044_LAMPIRAN.pdf

S aat ini apartemen menjadi alternatif hunian bagi warga Jakarta. Untuk menunjang kegiatan pada suatu apartemen, penyediaan air bersih serta pendistribusiannya menjadi salah satu ha! yang sangat penting. Adapun hasil buangan dari kegiatan apartemen seperti air kamar mandi, dan dapur juga memerlukan sistem penyaluran yang baik juga. The Times Square Residence merupakan suatu apartemen yang direncanakan terdiri dari 18 lantai. dimana lantai I dan 2 adalah Town House, lantai 3, 4, 6, 7, 8, 9, 11, 12, 13, 14, dan 16 adalah Tipikal, lantai 5, I 0, 15 adalah Junction dan lantai 17-18 adalah Duplex. Tujuan dari perencanaan sistem plambing ini adalah merencanakan sistem plambing pada The Times Square Residence yang sesuai dengan SNI 2000. Perencanaan ini meliputi penentuan sistem air bersih, air buangan serta pipa ven dan perhitungan dalam penetapan dimensi perpipaan serta peralatan penunjang. Perhitungan kebutuhan akan air bersih dalam perencanaan apartemen ini berdasarkan unit beban alat plambing. Sumber air berasal dari PDAM dan sumur dalam. Dari hasil perhitungan perpipaan air bersih diperoleh diameter terbesar dari seluruh stack adalah 65 mm. l-lidrofor dipasang pada lantai 16 untuk menjamin tekanan air yang dibutuhkan. Sistem penyaluran air buangan dilakukan secara gravitasi. Sistem penyaluran air buangan pada apa11emen ini dibagi menjadi air kotor dan air kotoran. Diameter pipa mendatar pipa air kotor yang didapat dari hasil perhitungan adalah sebesar 50 mm, sedangkan untuk diameter pi pa tegak sebesar I 00 mm. Untuk air kotoran, diameter pi pa mendatar yang didapat dari hasil perhitungan sebesar 75 mm, sedangkan untuk diameter pipa tegak memiliki diameter yang sama dengan pi pa tegak air kotor yaitu sebesar I 00 mm. Dari basil perhitungan kebutuhan air bersih didapat 4 reservoir atas dimana I reservoir untuk 7 stack dan 4 reservoir bawah, dimana I reservoir bawahmenyuplai I reservoir atas. Volume reservoir atas berkisar antara 50-130 m3.Untuk volume reservoir bawah berkisar antara 60-170 m 3• Penentuan pipa ven berdasarkan ukuran pipa.tegak air buangan yang dilayani. Diameter terbesar pipa mendatar dan tegak ven adalah 50. Tujuan dari pemasangan PRY adalah untukmengurangi tekanan berlebih pada pipa air bersih. PRY dipasang pada lantai 6.

N owdays, Apartments are an alternative solution for people of Jakarta to Jive in. To support activities of an apartment, clean water supply and its distribution is becoming one of the most important things. The need oi\" system to dump wastewater from apartment activity such as water from bathwom is also important. The Times Square Residence is an apartment which is clcsignccl \\\\ith 18 floor. where the f[rst and second floors arc Town Houses, the 3rd. 4th, 6th. 7th. 8th. 9th, 11th. 12th, 13th. 14th. and 16th floors are typical. the 5th. I 0th, 15th floors are Junction and 17th -18th floors are Duplex.1,he purpose of plu111bing systcn1 planning is to design a plu1nbing syste1n on l,hcTimes Square Residence which is according to SNJ 2000. This planning is covering the clean \\Yater supply systc111, \\Vaste\\vatcr and vent and the calculation in determining the piping dimension and supporting equipments. The calculation on the needs of clean water in this design is based on fixture unit. The clean water of water is from PDAM and deep well. From the result of the clean water piping calculation, the biggest diameter from all of the stacks is 65 mm. Hidrofor is installed on the 16th floor to insure the adequate pressure. The wastewater system is done by gravity. and divided by black water used and wastewater. The horizontal pipe diameter on dirty water pipe is SO 111111, and for the vertical one is I 00 111111. For wastewater, the horizontal pipe diameter is 75 mm. and the diameter of vertical pipe is using the same diameter with the dirty waler which is I 00 mm. From the calculation of clean water needs, there are 4 roof reservoir. where I reservoir for 7 stack and 4 ground reservoir, where l below reservoir supplv Iroof reservoir with an average volume of 50-130 m 3• And the average volu111 ofground reservoir is 60-170 m3. The determination of vent pipe is based on vertical wastewater pipe. The biggest horizontal and vertical diameter for vent pipe is 50 mm. The purpose of PRY is to reduce over loaded pressure on clean water pipe. PRY is installed on the 6th floor.

Bagaimana Anda menilai Koleksi ini ?