DETAIL KOLEKSI

Penentuan isi awal minyak di tempat dengan metode volumetrik dan material balance garis lurus Havlena-Odeh dan perkiraan produksi zona ENH pada Lapangan X


Oleh : Eoremila Ninetu Hartantyo

Info Katalog

Nomor Panggil : 02/TP/2015

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2015

Pembimbing 1 : Lestari Said

Subyek : Petroleum reserves;Petroleum - geology

Kata Kunci : the determination of the initial content of oil, volumetric methods, material balance, production es

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07110093_1.pdf
2. 2015_TA_TM_07110093_2.pdf
3. 2015_TA_TM_07110093_3.pdf
4. 2015_TA_TM_07110093_4.pdf
5. 2015_TA_TM_07110093_5.pdf
6. 2015_TA_TM_07110093_6.pdf
7. 2015_TA_TM_07110093_7.pdf
8. 2015_TA_TM_07110093_8.pdf

L apangan X adalah lapangan yang berada di Sumatra dan merupakan wilayah kerja PT. Chevron Pacific Indonesia di Provinsi Riau. Lapangan X mulai berproduksi pada Agustus 2008 yang memiliki 6 sumur dengan satu reservoir, yaitu zona ENH. Dalam menghitung isi awal minyak di tempat, metode yang digunakan adalah metode volumetrik dan material balance garis lurus Havlena - Odeh. Dari hasil perhitungan isi awal minyak di tempat zona ENH menggunakan metode volumetrik didapat sebesar 5.860.310 STB. Dalam metode material balance garis lurus Havlena - Odeh, dibutuhkan nilai perembesan air (water influx) yang dicari dengan menggunakan metode Van Everdingen-Hurst. Nilai perembesan air (B) untuk zona ENH yaitu sebesar 311 BBL/psia. Untuk isi awal minyak di tempat menggunakan metode material balance garis lurus Havlena - Odeh didapat sebesar 6.000.000 STB. Untuk mengetahui performance produksi dan estimate ultimate recovery (EUR) digunakan metode decline curve analysis. Dengan mengetahui batas economic limit zona ENH sebesar 40 BOPD, maka dapat dicari forecast laju alir minyak dan kumulatif produksi dari zona ENH. Batas economic limit tercapai pada Maret 2019 dengan nilai recovery factor sebesar 57,95%

X field is located in Sumatra and a work field of PT Chevron Pacific Indonesia in Riau. X field started operating in August 2000 with 6 wells and one reservoir named ENH zone. There are two methods to calculate the original oil in place of ENH zone, which is volumetric method and material balance method. From the calculation of original oil in place of ENH zone using volumetric method is 5.860.310 STB. In Havlena - Odeh straight line material balance method needs the number of water influx. The water influx can be determine using Van-Everdingen Hurst method. The constant number of water influx of ENH zone is 311 BBL/psia. The original oil in place calculation of ENH zone using material balance method is 6.000.000 STB. Decline curve analysis is a method to determine the production performance and estimate ultimate recovery (EUR). By knowing the economic limit rate of ENH zone at 40 BOPD, it can be searched the oil rate and cumulative oil production of ENH zone. The economic limit rate of ENH is reached in March 2019 with recovery factor at 57,95%.

Bagaimana Anda menilai Koleksi ini ?