DETAIL KOLEKSI

Evaluasi ketercapaian pemindahan overburden di PT Gavin Maju Jaya, pada jobsite PT Citra Baara Raya, Desa Keban, Kec. Lahat, Lahat, Sumatra Selatan


Oleh : Frananda Ajie Ismullah

Info Katalog

Nomor Panggil : 741/TT/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Syamidi Patian

Subyek : Coal mines and mining

Kata Kunci : BCM, production target, overburden, block 1

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STT_073001900071_Halaman-judul.pdf
2. 2020_TA_STT_073001900071_Halaman-pengesahan.pdf
3. 2020_TA_STT_073001900071_BAB-1_Pendahuluan.pdf
4. 2020_TA_STT_073001900071_BAB-2_Tinjauan-Literatur.pdf
5. 2020_TA_STT_073001900071_BAB-3_Kerangka-Konsep.pdf
6. 2020_TA_STT_073001900071_BAB-4_Metode.pdf
7. 2020_TA_STT_073001900071_BAB-5_Kesimpulan.pdf
8. 2020_TA_STT_073001900071_Daftar-Pustaka.pdf
9. 2020_TA_STT_073001900071_Lampiran.pdf

P PT. Gavin Maju Jaya mempunyai target produksi overburden bulanansebesar 40.000 bcm/bulan, yang di kerjakan oleh Sub kontraktor PT. Bara BerkahBuana yang mengerjakan di Blok 1, namun pada penelitian ini produksi aktualoverburden pada bulan september hanya mendapatkan 13,314 bcm. Penelitan inibertujuan untuk mengevaluasi ketercapaian pemindahan overburden berdasarkanmatch factor dari alat gali muat dan alat angkut yang digunakan untuk pemindahanoverburden di blok 1. Dengan pengambilan data primer berupa cycle time dari alatgali muat dan angkut di dapat match factor sebesar 1,24 dengan artian alat angkutmenunggu untuk di isi. Dalam penelitian ini juga menghitung produktifitas alat galimuat, dimana diperoleh hasil sebesar 24,23 BCM/jam. Dengan adanya nilai tersebutdi buatlah simulasi perhitungan match factor untuk mendapatkan nilai yang matchantara alat gali muat dan alat angkut, setelah dilakukan simulasi didapatkan nilaimatch factor sebesar 1,03 dengan konsekuensi penambahan alat muat sebanyak 1unit dan penambahan alat angkut sebanyak 2 unit. Maka akan didapat produktifitasalat angkut sebesar 48,46 BCM/jam. Sehingga kebutuhan target pemindahanoverburden dapat tercapai pada jumlah produksi sebesar 41.048 BCM/bulan.

P PT. Gavin Maju Jaya has a monthly overburden production target of40,000 bcm / month, which is carried out by PT. Bara Berkah Buana worked onBlock 1, but in this study the actual production of overburden in September onlyreceived 13,314 bcm. This research aims to evaluate the achievement of overburdenremoval based on the match factor of the loading and unloading equipment usedfor the transfer of overburden in block 1. With primary data collection in the formof cycle time from the loading and unloading and conveying equipment, a matchfactor of 1.24 means conveyance waiting to be loaded. In this study also calculatedthe productivity of the digging and unloading equipment, which obtained results of24.23 BCM / hour. With this value, a match factor calculation simulation is madeto get the match value between the loading and unloading equipment, after thesimulation is obtained the match factor value is 1.03 with the consequence of adding1 unit of loading equipment and adding 2 units of conveyance. Then the productivityof the conveyance will be obtained at 48.46 BCM / hour. So that the need foroverburden removal targets can be achieved at a total production of 41,048 BCM/ month.

Bagaimana Anda menilai Koleksi ini ?