DETAIL KOLEKSI

Penentuan isi awal gas di tempat menggunakan Metode Material Balance pada reservoir I


Oleh : Indah Oktaviani Hardi

Info Katalog

Nomor Panggil : 1229/TP/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Mulia Ginting

Pembimbing 2 : Ghanima Y.

Subyek : Gas reservoirs

Kata Kunci : initial gas in place, balance material, MBAL software.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STP_071001500059_Halaman-Judul.pdf 17
2. 2020_TA_STP_071001500059_Pengesahan.pdf
3. 2020_TA_STP_071001500059_Bab-1_Pendahuluan.pdf 2
4. 2020_TA_STP_071001500059_Bab-2_Tinjauan-literatur.pdf
5. 2020_TA_STP_071001500059_Bab-3_Kerangka-Konsep.pdf
6. 2020_TA_STP_071001500059_Bab-4_Metode.pdf
7. 2020_TA_STP_071001500059_Bab-5_Kesimpulan.pdf
8. 2020_TA_STP_071001500059_Daftar-Pustaka.pdf 1
9. 2020_TA_STP_071001500059_Lampiran.pdf

R Reservoir I merupakan reservoir gas yang terletak di daerah Prabumulih,Sumatera Selatan. Tekanan awal sebesar 2.286 psia dan temperatur 240oF.Reservoir I berproduksi sejak Januari 2012 sampai dengan saat ini, dengan totalproduksi gas (Juni 2019) sebesar 32.178 MMSCF. Dalam pengembangan suatulapangan gas bumi ada beberapa faktor penting yang harus ditentukan secaraakurat, salah satunya dalam menentukan isi awal gas di tempat atau Initial Gas InPlace (IGIP), nilai tersebut akan berperan penting dalam keputusan dasarpengembangan dan operasional suatu reservoir.Perhitungan Initial Gas In Place (IGIP) dilakukan dengan menggunakanmetode material balance P/Z dan simulasi MBAL. Metode material balancedipilih karena memperhitungkan kesetimbangan massa dan tenaga dorongreservoir, dan data yang diperlukan lebih lengkap dibandingkan metode yang lain.Pada perhitungan dengan menggunakan metode material balance P/Z, nilai InitialGas In Place yang didapat sebesar 60.915,49 MMSCF, dan nilai perhitunganmenggunakan software MBAL sebesar 60.604,5 MMSCF. Jenis tenaga dorongreservoir I adalah depletion drive, yang ditentukan dari plot P/Z vs Gp yangmenghasilkan garis lurus. Berdasarkan nilai tekanan abandon sebesar 300 psiadidapatkan nilai estimated ultimate recovery sebesar 53.700 MMSCF, dengan nilairecovery factor 88,15% dan sisa gas yang dapat diproduksikan (remainingreserves) sebesar 21.522 MMSCF.

R Reservoir I is a gas reservoir located in Prabumulih area, South Sumatra.Initial pressure of 2,286 psia and temperature of 240ºF. Reservoir I has been inproduction since January 2012, with a total gas production (June 2019) of 32,178MMSCF. In the development of a natural gas field there are several importantfactors that must be determined accurately, one of which is in determining theInitial Gas In Place (IGIP), this value will play an important role in the basicdevelopment and operational decisions of a reservoir.Initial Gas In Place (IGIP) calculations are performed using the materialbalance P/Z method and MBAL simulation. The material balance method waschosen because it takes into account the equilibrium mass and drive mechanismreservoir,and the required data is more complete than other methods. In thecalculation using the P/Z material balance method, Initial Gas In Place obtained is60,915.49 MMSCF, and the calculation value using MBAL software is 60.604.5MMSCF. The reservoir's drive mechanism type is the depletion drive, which isdetermined from the P/Z vs Gp plot which produces a straight line. Based on theabandonment pressure value of 300 psia. Reservoir I has an estimated ultimaterecovery value of 53,700 MMscf, with a recovery factor value of 88.15% andremaining reserves of 21,522 MMscf.

Bagaimana Anda menilai Koleksi ini ?