DETAIL KOLEKSI

The successful use of sand consolidation treatment at Tunu field

1.0


Oleh : Adhityas Vena Sasmita

Info Katalog

Nomor Panggil : 1201/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Sisworini

Pembimbing 2 : Reno Pratiwi

Subyek : Reservoir;Petroleum engineering

Kata Kunci : sand consolidation

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071.014.006_HALAMAN-JUDUL.pdf -1
2. 2019_TA_TM_071.014.006_BAB-1.pdf
3. 2019_TA_TM_071.014.006_BAB-2.pdf
4. 2019_TA_TM_071.014.006_BAB-3.pdf
5. 2019_TA_TM_071.014.006_BAB-4.pdf
6. 2019_TA_TM_071.014.006_BAB-5.pdf
7. 2019_TA_TM_071.014.006_Daftar-Pustaka.pdf
8. 2019_TA_TM_071.014.006_Lampiran.pdf

- -

O Oil and gas productions are demanded more these days. The industries itself have to be creative in many ways to increase the productions. The industries have to take risk no matter what to fulfill these demands including trying a few methods. Some of the techniques are brand new and there is always a possibility that it decreasing a production instead of increasing.TUNU Field has one of the biggest gas productions in the world and it belongs to Pertamina Hulu Mahakam. It is located in Mahakam River Delta of East Kalimantan, Indonesia. For almost 80 kilometers it is spread from north to south of the Mahakam River Delta and covering about 400 square kilometers. The reservoirs are characterized as multilayered reservoirs with perforated producing zones ranging from (MD) 700 m to 5100 m.Sand production in well is one of the obstacle that oil industries are facing when it comes to oil and gas productions. There is of course limitation to sand production; it can bring benefits to well performance in a suitable amount. It can also be completely harmful to a well or in producing oil and gas. To prevent sand breakthrough, a sand control is put to the test. In this paper, a new technique of sand control will be discussed along with its advantages and disadvantages. This new method is called sand consolidation.There are many different sand control in Tunu Field before the sand consolidation treatment is used. With these sand control there are must be a reason why finally the sand consolidation is chosen. Including the condition at Tunu’s Field reservoir that made the consideration to pick a new type of sand control.Before sand consolidation being treated, there are some criteria that have to match the standard. If it does not meet the criteria, it could mean either the reservoir does not need a sand control or using a mechanical sand control. When a reservoir is ready to be injected with the sand consolidation treatment, there are some procedure to follow. With the different type of sand consolidation chemicals, temperature of the reservoir are important to this operation. One wrong chemicals can lead in to failure.In sand consolidation, the velocity gas and the drawdown are being reviewed due to managing risk of the well’s integrity and the well productivity. To control sand successfully, several important objectives must be reached during consolidation. The primary objective of sand consolidation is to bond together the formation sand adjacent to every perforation. Considering the treatment is designed to function on formation sand a zone several feet in radius around the wellbore can be consolidated.Studies of consolidation failure mechanisms shows that plastics for the treatment must be inactive to reservoir fluids, should have a very quick curing days and must have a robust wetting properties. Including the gas flow rate increases after the treatment.

Bagaimana Anda menilai Koleksi ini ?