DETAIL KOLEKSI

Perencanaan remedial casing 13 3/8 sumur RMS pemboran berarah panas bumi


Oleh : Risckhel Maicakhi Sinaga

Info Katalog

Nomor Panggil : 1152/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Lilik Zabidi

Pembimbing 2 : Kris Pudyastuti

Subyek : Geothermal;Petroleum engineering

Kata Kunci : geothermal, production well, remedial casing, cementing, casing damage

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071001500125-Halaman-Judul.pdf 6
2. 2019_TA_TM_071001500125_BAB-1.pdf 3
3. 2019_TA_TM_071001500125_BAB-2.pdf
4. 2019_TA_TM_071001500125_BAB-3.pdf
5. 2019_TA_TM_071001500125_BAB-4.pdf
6. 2019_TA_TM_071001500125_BAB-5.pdf
7. 2019_TA_TM_071001500125_Daftar-Pustaka.pdf
8. 2019_TA_TM_071001500125_Lampiran.pdf

D Dalam kegiatan industri panas bumi, sumur memegang peranan penting untuk mensuplai uap ke pembangkit listrik panas bumi (PLTP). Asset tersebut dalam beberapa kasus umum perlu dirawat seiring dengan jangka waktu operasi, karena adanya penurunan kapasitas produksi sumur. Sumur X pada lapangan Y pada studi ini terdeteksi telah mengalami penurunan produksi dari 5 MW menjadi 1,9 MW setelah 5 bulan beroperasi, sehingga dipertimbangkan untuk dilakukan remedial casing. Studi ini dilakukan dilapangan panas bumi RMS, dengan tipe reservoir dua fasa bertemperatur dalam kisaran 290oC-300oC.Sebelum dilakukan proses remedial casing, terlebih dahulu dilakukan studi pendahuluan untuk mengetahui letak kerusakan dan penyebab yang terjadi pada casing. Hasil dari studi pendahuluan akan digunakan untuk menentukan cara terbaik melakukan remedial casing, perhitungan volume semen yang dibutuhkan, ukuran casing dan peralatan yang akan digunakan. Casing yang rusak akan diganti dengan casing yang baru dengan ukuran diameter yang berbeda.Tujuan dari penelitian yang didapat adalah memahami konsepsi dan pengerjaan remedial casing sumur panas bumi berarah diameter besar, yang ekonomis dan aman.

I In geothermal industry activities, wells play an important role in supplying steam to geothermal power plants (PLTP). The assets in some general cases need to be maintained along with the operating period, due to a decrease in well production capacity. The X well in the Y field in this study was detected to have decreased production from 5 MW to 1.9 MW after 5 months of operation, so remedial casing was considered. This study was carried out in the RMS geothermal field, with a two phase reservoir type temperature in the range of 290oC-300oC.Before the casing remedial process is carried out, first a preliminary study is conducted to find out the location of the damage and the cause of the casing. The results of the preliminary study will be used to determine the best way to do remedial casing, calculation of the volume of cement needed, the size of the casing and the equipment to be used. The damaged casing will be replaced with a new case with a different diameter size.The aim of the research was to understand the conception and work of remedial casing of large diameter, large diameter geothermal wells.

Bagaimana Anda menilai Koleksi ini ?