DETAIL KOLEKSI

Evaluasi dan optimasi perencanaan casing sumur R1,Prabumulih PT. Pertamina EP


Oleh : Abdurrahman Malik Setiawan

Info Katalog

Nomor Panggil : 494/TP/2016

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Faisal E. Yazid

Pembimbing 2 : Abdul Hamid

Subyek : Casing Design, Teknik Pemboran

Kata Kunci : Casing Design, Teknik Pemboran

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. TA_TM_071.12.002_Halaman-Judul.pdf 18
2. TA_TM_071.12.002_-Bab-I.pdf
3. TA_TM_071.12.002_Bab-II.pdf
4. TA_TM_071.12.002_Bab-III.pdf
5. TA_TM_071.12.002_Bab-IV.pdf
6. TA_TM_071.12.002_Bab-V.pdf
7. TA_TM_071.12.002_-Bab-VI.pdf 2
8. TA_TM_071.12.002_-DAFTAR-PUSTAKA-revisi-oye.pdf 1
9. TA_TM_071.12.002_lampiran.pdf
10. TA_TM_071.12.002_Paper-Tugas-Akhir-Abdurrahman.pdf

S Semua perusahan bidang energi khususnya indsustri di minyak dan gas dalam proses pemboran pasti ingin mempunyai biaya yang seminimalis mungkin tetapi tetap aman dalam proses aplikasi perencaaannya. Dalam hal tersebut maka perencaan casing atau pipa selubung harus sangat diperhatikan. Pertama, casing harus dipasang sebagai penahan bentuk lubang sumur agar tetap stabil juga sebagai penghubung antara bagian permukaan dengan reservoir migas saat berlangsung nya proses pemboran dan produksi. Kedua, hal yang dilakukan dalam perencanaan casing adalah penentuan kedalaman dan posisi casing yang akan disemen, kemudian dilakukan perhitungan seperti burst, collapse, dan tension. Ketiga macam tekanan yang akan diterima casing yang akan digunakan sebagai bahan acuan dalam memilih ukuran, grade, dan berat casing harus diperhatikan, jadi perlu dilakukan perhitungan yang optimal pada perencanaanya. Pada penelitian ini penulis akan mengevaluasi perencanaan casing pada sumur R1, Prabumulih, Sumatera Selatan dan optimasi dengan menggunakan kedalaman set casing yang sama dengan kantor. Metode yang digunakan dalam perhitungan ini adalah metode Maximum Load dengan penambahan asumsi 1/4 lost dan 3/4 return dengan mud pada perhitungan collapse. Tugas akhir ini diharapkan dapat digunakan sebagai saran dan bahan untuk mengevaluasi perencanaan casing yang paling baik dan aman.

A All companies in energy sector especially petroleum and gas industry in the process of drilling would definitely want to have the minimum and but still safe at its operation. Therefore, the planning of casing design must really be calculated. Step one in casing design is setting down the casings as retaining barrier of the wellbore and to maintain hole stability while the casings are connected from surface to sub-surface during drilling process and production process. Secondly in the casing design is determining the depth and the position at casing to be set and cemented, also we have to calculate all the pressures exerted on the casing string, such as burst pressure, collapse pressure, and tension pressure. Those three pressures affect the strength of casing at the time of installation as well as during the production process must be calculated as a reference to determine the size, grade, weight, and exerted type of connection casing used, so there will be a optimized calculation. This final project evaluates casing design of R1, Prabumulih, South Sumatera and optimizes casing grade. The evaluation focuses on casing setting depth and suitable casing grade selection that well result in optimum casing string in term of safety and economic. This study uses Maximum Load with 1/4 lost and 3/4 mud return assumption. I sincerely hope that this study can be used to evaluate the best casing design and safe.

Bagaimana Anda menilai Koleksi ini ?