DETAIL KOLEKSI

Evaluasi kinerja injeksi air pada lapangan X menggunakan metode hall plot, buckley-leverett, dan pattern & balance

1.0


Oleh : Muhamad Rizki

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Rachmat Sudibyo

Pembimbing 2 : Djoko Sulistyanto

Subyek : Drilling - chemical injection;Petroleum engineering

Kata Kunci : waterflooding, hall plot, tubing

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112146_Halaman-Judul.pdf 24
2. 2016_TA_TM_07112146_Bab-1.pdf
3. 2016_TA_TM_07112146_Bab-2.pdf
4. 2016_TA_TM_07112146_Bab-3.pdf
5. 2016_TA_TM_07112146_Bab-4.pdf 27
6. 2016_TA_TM_07112146_Bab-5.pdf 7
7. 2016_TA_TM_07112146_Bab-6.pdf
8. 2016_TA_TM_07112146_Daftar-Pustaka.pdf
9. 2016_TA_TM_07112146_Lampiran.pdf

W Waterflooding di "X" Lapangan telah dilakukan sejak Agustus 2013. Pada 2013, injeksi telah sepenuhnya dilaksanakan dan ada 4 injeksi sumur mana air disuntikkan melalui tabung dan anulus. Waterflooding digunakan untuk mendorong sisa minyak di reservoir sehingga minyak dapat diproduksi. evaluasi yang diperlukan untuk menentukan hasil waterflooding. Dalam tugas akhir ini, ada tiga metode yang akan digunakan untuk mengevaluasi waterflooding, mereka adalah metode Plot Balai untuk mengevaluasi injeksi baik kondisi, metode Buckley-Leverett menyamakan air waktu terobosan dari sumur injeksi untuk sumur produksi. Kemudian Pola & Balance metode untuk menentukan kapasitas injector. Berikut adalah hasil dari setiap evaluasi. Evaluasi dengan Balai Plot Metode menunjukkan bahwa sebagian besar sumur yang stabil. Terobosan air tercepat waktu 229 hari dan paling lama satu 6752 hari. Kapasitas Injector di empat sumur lebih dan di tiga sumur kurang dari dihitung, sehingga perlu melakukan beberapa penyesuaian kapasitas injector.

W Waterflooding at “X” Field has been done since August 2013. In 2013, the injection has been fully implemented and there are 4 injection wells where the water injected through tubing and annulus. Waterflooding is used to push the remaining oil in the reservoir so that the oil can be produced. Evaluations are needed to determine the result of waterflooding. In this final assignment, there are three methods that will be used to evaluate the waterflooding, they are the Hall Plot method to evaluate injection well condition, the Buckley-Leverett method to equate water breakthrough time from an injection well to production well. Then the Pattern & Balance method to determine the injector capacity. Here are the results from each evaluation. Evaluation with Hall Plot method shown that most of the wells are stable. The fastest water breakthrough time is 229 days and the longest one is 6752 days. Injector capacity in four wells are more and in three wells are less than calculated, so need to do some adjustment in injector capacity.

Bagaimana Anda menilai Koleksi ini ?