Analisis squeeze cementing pada sumur DVR-42 lapangan Prabumulih
Nomor Panggil : 1296/TP/2020
Penerbit : FTKE - Usakti
Kota Terbit : Jakarta
Tahun Terbit : 2020
Pembimbing 1 : Abdul Hamid
Pembimbing 2 : Dina Asmaul Chusniyah
Subyek : Oil well cementing
Kata Kunci : primary cementing, cement bond log, variable density log, squeeze cementing, slurry
Status Posting : Published
Status : Lengkap
No. | Nama File | Hal. | Link |
---|---|---|---|
1. | 2020_TA_STP_071001600033_Halaman-Judul.pdf | ||
2. | 2020_TA_STP_071001600033_Lembar-Pengesahan.pdf | ||
3. | 2020_TA_STP_071001600033_Bab-1_Pendahuluan.pdf | 2 | |
4. | 2020_TA_STP_071001600033_Bab-2_Tinjauan-literatur.pdf | 12 |
|
5. | 2020_TA_STP_071001600033_Bab-3_Metodelogi-Penelitian.pdf | 4 |
|
6. | 2020_TA_STP_071001600033_Bab-4_Hasil-dan-Pembahasan.pdf | 10 |
|
7. | 2020_TA_STP_071001600033_Bab-5_Kesimpulan.pdf | 1 |
|
8. | 2020_TA_STP_071001600033_Daftar-Pustaka.pdf | 2 | |
9. | 2020_TA_STP_071001600033_Lampiran.pdf |
|
K Kegiatan pemboran industri hulu migas tidak dapat dipisahkan dari pekerjaanpenyemenan. Terdapat dua macam penyemenan yang dilakukan, yaitu Primarycementing yang dilakukan pada saat pertama kali casing dimasukan kedalam lubangbor dan Secondary cementing yang dilakukan untuk menyempurnakan penyemenanpertama. Squeeze cementing dilakukan dengan memompakan bubur semen ke titiktarget tertentu dalam sumur. Pada penelitian ini penulis akan mengevaluasi hasilpenyemenan, dimana menurut pembacaan log CBL dan VDL terdapatnya ikatansemen yang kurang sempurna pada primary cementing casing liner 7 inch sehinggaharus dilakukan squeeze cementing untuk menyempurnakan ikatan semen yangkurang baik pada sumur DVR – 42 Lapangan Prabumulih. Analisis yang dilakukanmeliputi pembacaan log before dan after squeeze cementing, perhitungan terhadapvolume slurry cement, displacement volume, dan jumlah zat aditif yang digunakanpada pekerjaan squeeze cementing.
D Drilling activities of upstream oil and gas industry cannot be separated fromcementing work. There are two types of cementing that are carried out is Primarycementing which performed after the casing has been run in the hole and Secondarycementing which performed to complement the first cementing. Squeeze cementingis done by pumping cement slurry at target point in the well. In this study the authorwill evaluate the result of cementing job, where is according to the CBL and VDLreadings there is an favorable bonding cement in the primary cementing 7 inchcasing liner, so squeeze cementing must be done to repair the result of bad bondingcement in the DVR – 42 Field Prabumulih. The analysis is included the reading ofbefore and after squeeze cementing job, the calculation of volume slurry, volumedisplacment, and the amount of additives used in squeeze cementing job.