Analisa torsi dan drag sumur tum-143 rig darat 1000 hp ptm z9 sanga sanga area


Oleh : Binsar M Siregar

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2025

Pembimbing 1 : Bayu Satiyawira

Pembimbing 2 : Listiana Setiawati

Kata Kunci : Directional drilling, Torque, Drag, Software Wellplan

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2025_SK_STP_071002000007_Halaman-Judul.pdf 13
2. 2025_SK_STP_071002000007_Surat-Pernyataan-Revisi-Terakhir.pdf 1
3. 2025_SK_STP_071002000007_Surat-Hasil-Similaritas.pdf 1
4. 2025_SK_STP_071002000007_Halaman-Pernyataan-Persetujuan-Publikasi-Tugas-Akhir-untuk-Kepentingan-Akademis.pdf 1
5. 2025_SK_STP_071002000007_Lembar-Pengesahan.pdf 1
6. 2025_SK_STP_071002000007_Pernyataan-Orisinalitas.pdf 1
7. 2025_SK_STP_071002000007_Formulir-Persetujuan-Publikasi-Karya-Ilmiah.pdf 1
8. 2025_SK_STP_071002000007_Bab-1.pdf 4
9. 2025_SK_STP_071002000007_Bab-2.pdf 23
10. 2025_SK_STP_071002000007_Bab-3.pdf 4
11. 2025_SK_STP_071002000007_Bab-4.pdf 19
12. 2025_SK_STP_071002000007_Bab-5.pdf 2
13. 2025_SK_STP_071002000007_Daftar-Pustaka.pdf 2
14. 2025_SK_STP_071002000007_Lampiran.pdf 9

S Seiring dengan berkembangnya teknologi, proses pemboran terhadap eksplorasi minyak dan gas bumi tidak hanya dilakukan secara vertikal tetapi dapat juga dilakukan dengan cara mengarahkan lubang sumur pada suatu area dengan membelokkan lubang pada sudut tertentu atau disebut pemboran berarah (Directional Drilling). Salah satu hambatan yang sering terjadi yaitu pada torsi dan drag sehingga perlu adanya evaluasi. Beban torsi dipengaruhi oleh sudut kemiringan inklinasi lintasan pemboran sedangkan beban drag dipengaruhi oleh gesekan antara rangkaian pipa pemboran dengan dinding lubang bor saat memasukkan dan mencabut rangkaian. Sumur yang akan dievaluasi pada penelitian ini adalah Sumur TUM-143 yang merupakan sumur horizontal dengan metode pemboran S-Type. Perhitungan beban torsi dan drag memiliki tujuan yang penting dalam meminimalisirkan masalah yang terjadi pada operasi pemboran. Perhitungan beban torsi dan drag pada tugas akhir ini akan dibandingkan dengan dua metode perhitungan yaitu perhitungan manual menggunakan microsoft excel dan Software Wellplan. Untuk perhitungan beban torsi dan drag menggunakan beberapa parameter yaitu torque rotating on bottom, torque rotating off bottom, Weight on Bit (WOB), pick up, slack off, rotating off bottom. hookload rotating off bottom pada software sebesar 172,60 klbs sedangkan manual sebesar 95,30 klbs. Torque rotating on bottom dengan perhitungan software sebesar 14149,50 ft-lb sedangkan perhitungan manual sebesar 16335,44 ft-lb. Torque off bottom dengan perhitungan software sebesar 4526,90 klbs sedangkan perhitungan manual sebesar 5034,51 klbs. Pick up drag dengan perhitungan software sebesar 19,80 klbs sedangkan perhitungan manual sebesar 12,03 klbs. Slack off drag dengan perhitungan software sebesar 16,60 klbs sedangkan perhitungan manual sebesar 61,14 klbs. Pada saat actual drilling operation tidak ditemukan problem pemboran seperti putus rangkaian sehingga dapat menjadi acuan sebagai analisa torsi dan drag.

A Along with the development of technology, the drilling process for oil and gas exploration is not only done vertically but can also be done by directing the wellbore in an area by turning the hole at a certain angle or called directional drilling. One of the obstacles that often occurs is in torque and drag so that it needs evaluation. The torque load is affected by the inclination angle of the drilling trajectory inclination while the drag load is affected by the friction between the drilling pipe circuit and the borehole wall when inserting and pulling out the circuit. The well to be evaluated in this study is the TUM-143 Well which is a horizontal well with the S-Type drilling method. Calculation of torque and drag loads has an important purpose in minimizing problems that occur in drilling operations. The calculation of torque and drag loads in this final project will be compared with two calculation methods, namely manual calculation using Microsoft Excel and Wellplan software. For the calculation of torque and drag loads using several parameters, namely torque rotating on bottom, torque rotating off bottom, Weight on Bit (WOB), pick up, slack off, rotating off bottom. hookload rotating off bottom in the software is 172.60 klbs while the manual is 95.30 klbs. Torque rotating on bottom with software calculation is 14149.50 ft-lb while manual calculation is 16335.44 ft-lb. Torque off bottom with software calculation is 4526.90 klbs while manual calculation is 5034.51 klbs. Pick up drag with software calculations amounted to 19.80 klbs while manual calculations amounted to 12.03 klbs. Slack off drag with software calculation is 16.60 klbs while manual calculation is 61.14 klbs. During the actual drilling operation, there were no drilling problems such as circuit breakage so that it can be used as a reference for torque and drag analysis.