Analisis potensi pembangunan pembangkit listrik tenaga sampah (PLTSa) di Kota Tangerang
Penerbit : FTI - Usakti
Kota Terbit : Jakarta
Tahun Terbit : 2023
Pembimbing 1 : Annisa Bhikuning
Subyek : Flexible AC transmission systems;Environmental engineering
Kata Kunci : PTLSa, Rawa Kucing landfill, aspen hysys, ideal rankine cycle, net present value, internal rate of r
Status Posting : Published
Status : Tidak Lengkap
No. | Nama File | Hal. | Link |
---|---|---|---|
1. | 2023_TA_STM_061002004009_-Halaman-Judul.pdf | ||
2. | 2023_TA_STM_061002004009_-Lembar-Pengesahan.pdf | ||
3. | 2023_TA_STM_061002004009_-Bab-1_Pendahuluan.pdf | ||
4. | 2023_TA_STM_061002004009_-Bab-2_Tinjauan-Pustaka.pdf |
|
|
5. | 2023_TA_STM_061002004009_-Bab-3_Metodologi-Penelitian.pdf |
|
|
6. | 2023_TA_STM_061002004009_-Bab-4_Analisis-dan-Pembahasan.pdf |
|
|
7. | 2023_TA_STM_061002004009_-Bab-5_Kesimpulan.pdf | ||
8. | 2023_TA_STM_061002004009_-Daftar-Pustaka.pdf |
K Kota Tangerang merupakan salah satu kota terpilih untuk pembangunan pembangkit listrik tenaha dampah (PLTSa) pada peraturan Presiden nomor 18/2016 tentang percepatan pembangunan instalasi pengolahan sampah menjadi energi listrik berbasis teknologi ramah lingkungan yang diperbaharui pada tahun 2018 ...
T Tangerang city is one of cities chosen for the construction of a waste to energy power plant (PLTSa)in presidential regulation number 18/2016 concerning in the accleration of the construction of environmentally friendly technology which was renewed in 2018...