DETAIL KOLEKSI

Analisis hasil stimulasi acidicing pada sumur gas dengan menggunakan metode pressure build up dan deliverability test


Oleh : Brian Rizki Riswanto

Info Katalog

Nomor Panggil : 1325/TP/2021

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Suryo Prakoso

Pembimbing 2 : Ridha Husla

Subyek : Petroleum engineering

Kata Kunci : horner method, well test, deliverability test, pressure build up test

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STP_071001600025_Halaman-Judul.pdf
2. 2021_TA_STP_071001600025_Pengesahan.pdf
3. 2021_TA_STP_071001600025_Bab-1_Pendahuluan.pdf 2
4. 2021_TA_STP_071001600025_Bab-2_Tinjauan-Umum.pdf
5. 2021_TA_STP_071001600025_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_STP_071001600025_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2021_TA_STP_071001600025_Bab-5_Kesimpulan.pdf
8. 2021_TA_STP_071001600025_Daftar-Pustaka.pdf
9. 2021_TA_STP_071001600025_Lampiran.pdf

S Sumur BRR-19 merupakan sumur gas yang telah mengalami penurunanproduksi sehingga dilakukannya acidizing untuk mengatasi masalah formationdamage yang terjadi selama proses produksi. Adapun metode pressure build updan deliverabilitas digunakan untuk menganalisa hasil dari acidizing yangdilakukan. Pressure build up pada sumur BRR-19 dianalisa menggunakan metodeHorner pendekatan Ψ(P) dan dengan bantuan software ecrin. Sedangkan Ujideliverabilitas (deliverability test) yang digunakan pada sumur BRR-19 inimenggunakan metode modified isochronal test.Maksud dilakukannya penelitian ini ialah untuk dapat mengevaluasi hasildari acidizing dengan menggunakan pressure build up test dan deliverability test.Sedangkan tujuan dari penelitian ini ialah untuk mengetahui besarnya nilaipermeabilitas, skin, dan absolute open flow potential pada sumur BRR-19sebelum dan setelah acidizing. Untuk mencapai maksud dan tujuan tersebut telahdiperoleh data-data pendukung analisa seperti karakteristik reservoir, datatekanan, dan laju alir produksi pada sumur BRR-19.Hasil analisis pressure build up dengan metode Horner pendekatan (P)dan software Ecrin sebelum acidizing, nilai permeabilitasnya secara berturut-turutialah 4,25 mD dan 4,81 mD, sedangkan setelah acidizing nilainya ialah 4,788 mDdan 5,76 mD. Untuk nilai faktor skin sebelum acidizing yaitu 3,496 dan 3,62.Sedangkan untuk nilai skin setelah dilakukannya acidizing ialah -1,597 dan -2,13.Kemudian nilai absolute open flow potential yang diperoleh dengan metodemanual dan dengan software ecrin sebelum acidizing secara berturut-turut ialah19.724,043 Mscf/D dan 19.635 Mscf/D. Sedangkan nilai absolute open flowpotential setelah acidizing ialah 33.732,820 Mscf/D dan 30.661,3 Mscf/D.Dengan menurunnya nilai dari faktor skin dan adanya peningkatan pada nilaiabsolute open flow potential setelah dilakukannya acidizing, maka dapatdinyatakan bahwa stimulasi yang dilakukan pada sumur BRR-19 telah berhasildalam meningkatkan hasil produksi sumur tersebut.

T The BRR-19 well is a gas well that has experienced a decline inproduction so that acidizing is carried out to overcome the formation damageproblem that occurs during the production process. The pressure build up anddeliverability methods were used to analyze the results of the acidizing that wascarried out. Pressure build up on the well BRR-19 was analyzed using the Hornermethod Ψ(P) approach and with the help of ecrin software. Meanwhile, thedeliverability test used in the BRR-19 well uses the modified isochronal testmethod.The purpose of this research is to be able to evaluate the results ofacidizing using a pressure build up test and a deliverability test. Meanwhile, thepurpose of this study was to determine the value of permeability, skin, andabsolute open flow potential in the BRR-19 well before and after acidizing. Toachieve these aims and objectives, supporting data for analysis such as reservoircharacteristics, pressure data, and production flow rate at the BRR-19 well havebeen obtained.The results of the pressure build up analysis using the Horner methodΨ(P) approach and the Ecrin software method before acidizing, the permeabilityvalues were 4,250 mD and 4,81 mD, respectively, while after acidizing the valueswere 4,788 mD and 5,76 mD. For the skin factor values before acidizing, namely3,496 and 3,62. Meanwhile, the skin values after acidizing were -1,597 and -2,13.Then the absolute open flow potential value obtained by manual method and ecrinsoftware before acidizing was 19.724,043 Mscf/D and 19.635 Mscf/D,respectively. While the absolute open flow potential after acidizing is 33.732,820Mscf/D and 30.661,3 Mscf/D. With a decrease in the value of the skin factor andan increase in the absolute open flow potential value after acidizing, it can bestated that the stimulation carried out on the BRR-19 well has been successful inincreasing the production of the well.

Bagaimana Anda menilai Koleksi ini ?