DETAIL KOLEKSI

Perencanaan instalasi pipa pencegahan dan penanggulangan kebakaran pada Apartemen Grand Dhika City Jati Warna Jakarta Timur


Oleh : Alif Nurfalah Indriyanto

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Husein Abdul Aziz

Subyek : Pipeline - Fires and fire prevention

Kata Kunci : pipe installation, pump, fire protection system, volume, capacity, ground water reservoir (GWR)

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_STM_061001500065_Halaman-Judul.pdf
2. 2019_TA_STM_061001500065_Lembar-Pengesahan.pdf
3. 2019_TA_STM_061001500065_Bab-1_Pendahuluan.pdf
4. 2019_TA_STM_061001500065_Bab-2_Tinjauan-Pustaka.pdf
5. 2019_TA_STM_061001500065_Bab-3_Metodologi-Penelitian.pdf
6. 2019_TA_STM_061001500065_Bab-4_Analisis-Hasil-dan-Pembahasan.pdf
7. 2019_TA_STM_061001500065_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2019_TA_STM_061001500065_Daftar-Pustaka.pdf
9. 2019_TA_STM_061001500065_Lampiran.pdf

D Dalam membangun sebuah gedung ada beberapa hal yang perludiperhatikan khususnya dalam keamanan dan kenyamanan dalam sebuah gedung,salah satunya adalah sistem instalasi pipa pencegahan dan penanggulangankebakaran. Dalam sistem instalasi pipa pencegahan dan penanggulangankebakaran perlu diperhatikan beberapa hal diantaranya dalam pemilihan jenispompa, diameter pipa serta peralatan lainnya harus sesuai dengan peraturan dariNFPA. Apartemen grand dhika city jakarta timur adalah salah satu bangunanbertingkat tinggi yang sedang dalam pelaksanaan konstruksi. Apartemen initerdiri dari 22 lantai dengan luas per lantai adalah 1449 m2. Untuk memenuhikebutuhan air bersih per harinya diperlukan 191.200 liter/ hari untuk totalpenghuni sebanyak 3825 orang. Dari jumlah penghuni tersebut, maka didapatjumlah Ground Water Reservoar (GWR) yang dibutuhkan sebesar 250 m3. Untukmendistribusikan air dari Ground Water Reservoar (GWR) ke sistem FireProtection terpasang dibutuhkan 3 unit pompa utama. Total daya dari masing –masing pompa sebesar 220 KW. Untuk memenuhi kebutuhan sistem fireprotection pada apartemen Grand Dhika City jakarta dibutuhkan total 55 unitSprinkle Head dan 2 unit Indoor Hydrant Box pada setiap lantainya. Dari semuadata yang telah dihitung, maka didapatkan nilai proyek instalasi pipa pencegahandan penanggulangan kebakaran pada apartemen Grand Dhika City jakarta timursebesar Rp 7.487.611.749

I In constructing a building, there are several things that need to beconsidered, especially in the safety and comfort in a building, one of which is thepipe installation and fire prevention system. In the fire prevention and mitigationpipe installation system, several things must be considered, including the choiceof pump type, pipe diameter and other equipment in accordance with NFPAregulations. Grand dhika city apartment east jakarta is one of the high-risebuildings that are currently under construction. This apartment consists of 22floors with an area per floor is 1449 m2. To meet the daily need for clean water,191,200 liters / day is needed for a total of 3825 people. From the number ofoccupants, the number of Ground Water Reservoir (GWR) needed is 250 m3. Todistribute water from the Ground Water Reservoir (GWR) to the Fire Protectionsystem installed, it requires 3 main pumps. The total power of each pump is 220KW. To meet the needs of the fire protection system at Jakarta's Grand Dhika Cityapartment, a total of 55 units of Sprinkle Head and 2 units of Indoor Hydrant Boxare needed on each floor. From all the data that has been calculated, the value ofthe fire prevention and prevention pipeline installation project in East Jakarta'sGrand Dhika City apartment is Rp. 7,487,611,749

Bagaimana Anda menilai Koleksi ini ?