DETAIL KOLEKSI

Kajian teknis produktivitas alat muat dan alat angkut di PT SDIC Cement Indonesia Manokwari, Papua Barat

4.0


Oleh : Rafael Agustinus Makambak

Info Katalog

Nomor Panggil : 688/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Emmy Fatmi B.

Subyek : Mining engineering - Loading and carrying tools

Kata Kunci : productivity, loading and carrying tools, production targets, working time

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001400076_Halaman-Judul.pdf
2. 2019_TA_TB_073001400076_Bab-1.pdf
3. 2019_TA_TB_073001400076_Bab-2.pdf
4. 2019_TA_TB_073001400076_Bab-3.pdf
5. 2019_TA_TB_073001400076_Bab-4.pdf
6. 2019_TA_TB_073001400076_Bab-5.pdf
7. 2019_TA_TB_073001400076_Daftar-Pustaka.pdf
8. 2019_TA_TB_073001400076_Lampiran.pdf

U Untuk mencapai target produksi maka segala aspek perlu di perhatikan termasuk produktivitas. PT SDIC Papua Cement Indonesia, yang berlokasi di Kecamatan Maruni, Kabupaten Manokwari, Provinsi Papua Barat menambang batu gamping dengan system penambangan tambang terbuka dengan metode konvensional. Kegiatan penggalian dan pemuatan dilakukan oleh excavator 340D dan diangkut oleh dump truck hino 260. Target produksi yang ditetapkan perusahan yaitu 133.333,3 ton/ bulan. Data yang diperlukan pada penelitian ini yaitu data cycle time alat muat dan alat angkut. Rata – rata cycle time yang diperoleh yaitu untuk dump truck 14 menit dan untuk excavator 17,25 detik. Data ini kemudian diolah menggunakan exel untuk menentukan efisiensi kerja. Efisiensi kerja alat muat adalah 100% dan alat angkut adalah 57%. Setelah efisiensi kerja diperoleh maka dicari lagi produktivitas untuk tiap alat yaitu untuk dump truck dan excavator. Produktivitas yang didapat adalah untuk dump truck 68,40 ton/jam dan excavator 473,70 ton/jam. Kebutuhan alat yang diperlukan untuk mencapai produksi adalah 3 unit dump truck dan 1 unit excavator. Jam kerja yang diperlukan dalam 1 bulan untuk alat muat adalah 281 jam/bulan dan alat angkut 1.949 jam/bulan . Match faktor untuk 1 unit dump truck adalah 0,4. Dengan 1 unit excavator dan 3 unit alat angkut target produksi 133.333,3 ton/ bulan tidak tercapai.

T To achieve production target, all aspects need to be noticed including productivity. PT SDIC Papua Cement Indonesia, located in Maruni Sub-district, Manokwari Regency, West Papua Province mine limestone with open mine mining system with conventional method. Excavation and loading activities are carried out by 340D excavators and transported by Hino 260 dump trucks. The company's production Target is 133.333.3 tons/month. The data required in this research is a data cycle time loading and carrying tool. The average cycle time obtained is for the dump truck 14 minutes and for excavators 17.25 seconds. This Data is then processed using Exel to determine work efficiency. The working efficiency of the load tool is 100% and the carrying tool is 57%. After working efficiency obtained then sought again productivity for each tool namely for dump trucks and excavators. The productivity gained is for the dump truck 68,40 tons/hour and excavator 473,70 tons/hour. The need of tools needed to achieve production is 3 units of dump trucks and 1 excavator unit. The working hours required in 1 month for the loading tool are 281 hours/month and carry-on equipment 1949 hours/month. Match factor for 3 unit dump truck is 0,4. Match factor for 1 unit of dump truck is 0,4. With 1 excavator unit and 3 units of 133,333.3 tons/month of transport target equipment is not achieved

Bagaimana Anda menilai Koleksi ini ?