DETAIL KOLEKSI

Perancangan bukaan tambang batu bara PT. Muara Alam Sejahtera, Kabupaten Lahat, Sumaetra Selatan


Oleh : Febriyanza Irawan

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Pancanita Novi Hartami

Subyek : Overburden mining;Software minescape

Kata Kunci : overburden mining, software minescape, PT. Muara Alam Sejahtera, South Sumatra

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TB_07310014_Halaman-judul.pdf
2. 2016_TA_TB_07310014_Bab-1.pdf 5
3. 2016_TA_TB_07310014_Bab-2.pdf
4. 2016_TA_TB_07310014_Bab-3.pdf
5. 2016_TA_TB_07310014_Bab-4.pdf
6. 2016_TA_TB_07310014_Bab-5.pdf
7. 2016_TA_TB_07310014_Bab-6.pdf
8. 2016_TA_TB_07310014_Bab-7.pdf
9. 2016_TA_TB_07310014_Daftar-pustaka.pdf 1
10. 2016_TA_TB_07310014_Lampiran.pdf

P Perancangan desain bukaan tambang sangat penting dilakukan untuk membuat bentuk pit pada area penambangan. Pembuatan desain penambangan adalah awal dari kegiatan penambangan, sehingga perancangan harus dibuat sebaik mungkin agar bentuk pit mendukung kegiatan penambangan yang direncanakan PT Muara Alam Sejahtera. Tujuan perancangan desain pit ini adalah untuk menjadwalkan penambangan tiap waktunya dengan target produksi 836.087,11 ton batubara dan overburden sebesar 3.124.283,63 bcm. Perancangan desain ini menggunakan software minescape 4.01 yang menghasilkan rekomendasi geometri jalan dengan lebar 20 meter yang mengacu pada hauler HD 465 dan Kerax 38, dengan grade jalan 8%. Hasil rancangan desain bukaan tambang adalah pada bulan Juli 519.864,26 bcm overburden 133.662,35 ton batubara Agustus 448.743.99 bcm overburden 127.021,51 ton batubara, September 453.078,68 bcm overburden 124.311,67 ton batubara, Oktober 657.002,74 bcm overburden 163.263,81 ton, November 554.545,84 bcm overburden 147.777,65 ton batubara, Desember 491.048,12 bcm overburden 140.010,12 ton batubara dan total produksi bulan Juli-Desember adalah 3.124.283,63 bcm overburden 836.047,11 ton batubara.

O Open pit mining design is very important to make the shape of the pit in the mining area. Make a mining design is the start of mining operation, so the design must be made as possible in order to form a pit support the planned mining activities of PT Muara Alam Sejahtera. The purpose of design pit mining is to schedule each time with a target production of 836,087.11 tons of coal and overburden amounting to 3,124,283.63 bcm. The design of this design using software minescape 4.01 that generates recommendations road geometry with a width of 20 meters which refers to the hauler HD 465 and Kerax 38, with the 8% grade. Open pit mining design in July 519,864.26 bcm of overburden , 133,662.35 tons of coal, August 448.743.99 bcm overburden, 127,021.51 tons of coal, September overburden 453,078.68 bcm 124,311.67 tons of coal, in October 657,002.74 bcm overburden,coal 163 263 , 81 ton, November overburden 554,545.84 bcm , 147,777.65 tons of coal, December overburden 491,048.12 bcm, 140,010.12 tons of coal, and total production in July-December bcm overburden was 3,124,283.63 836,047.11 tons of coal.

Bagaimana Anda menilai Koleksi ini ?