Perencanaan sistem instalasi pipa pencegahan dan penanggulangan kebakaran pada Hotel Fashion B, Jakarta Barat
Penerbit : FTI - Usakti
Kota Terbit : Jakarta
Tahun Terbit : 2014
Pembimbing 1 : Husein Abdul Aziz
Subyek : Pipelines - Design and construction;Water supply
Kata Kunci : system planning, pipe installation, fire prevention and control, Hotel Fashion B, West Jakarta
Status Posting : Published
Status : Tidak Lengkap
No. | Nama File | Hal. | Link |
---|---|---|---|
1. | 2014_TA_STM_06109041_Halaman-Judul.pdf | 13 | |
2. | 2014_TA_STM_06109041_Lembar-Pengesahan.pdf | 2 | |
3. | 2014_TA_STM_06109041_Bab-1_Pendahuluan.pdf | 4 | |
4. | 2014_TA_STM_06109041_Bab-2_Tinjauan-Pustaka.pdf |
|
|
5. | 2014_TA_STM_06109041_Bab-3_Metodologi-Peremcanaan.pdf |
|
|
6. | 2014_TA_STM_06109041_Bab-4_Data-Lapangan.pdf |
|
|
7. | 2014_TA_STM_06109041_Bab-5_Perhitungan.pdf |
|
|
8. | 2014_TA_STM_06109041_Bab-6_Kesimpulan-dan-Saran.pdf | 2 | |
9. | 2014_TA_STM_06109041_Daftar-Pustaka.pdf | 1 | |
10. | 2014_TA_STM_06109041_Lampiran.pdf |
|
P Peralatan pencegahan dan penanggulangan kebakaran merupakan hal penting sebagai syarat bangunan gedung tinggi. Sistem pencegahan dan penanggulangan ini diharapkan sebagai usaha pertama bila terjadi bencanakebakaran sebelum petugas pemadam kebakaran sampai di lokasi yang tedadi kebakaran. Namun saangat di sayangkan instalasi ini masih dipandang sebelah mata sebagai fasilitas keamanan bagi para pengguna gedung tinggi.Perencanaan ini diawali dengan kunjungan lapangan guna mendapatkan data yang dibutuhkan untuk menentukan peletakan sprinkler head, siamesse connection dan hydrant system. Dalam kunjungan lapangan didapatkan pula bahwa gedung ini terdiri dari 11 lantai dan 1 basement. Selanjutnya dilakukan pengolahan data yang sesuai dengan ketentuan NPFA dan peraturan PEMDA.AnHasil perencanaan berkaitan g perhitungan diameter dan ketebalan pipa yang digunakan serta spesitikasi teknis a yang digunakan dan perhitungan I. volume ground water reservoir (GWR).
F Fire prevention and suppression equipment is a crucial requirement for high-rise buildings. This prevention and suppression system is expected to be the first line of defense in the event of a fire before firefighters arrive at the scene. However, it is unfortunate that this installation is still overlooked as a safety facility for high-rise building occupants.This planning process began with a site visit to obtain the necessary data to determine the placement of sprinkler heads, siamesse connections, and hydrant systems. The site visit also revealed that the building consists of 11 floors and 1 basement. The data was then processed in accordance with NPFA provisions and local government regulations.The planning results relate to the calculation of the diameter and thickness of the pipes used, the technical specifications used, and the calculation of the groundwater reservoir (GWR) volume.