DETAIL KOLEKSI

Skema perancangan instalasi sutt 150 kv di Daerah Perawang – Tenayan Riau


Oleh : Dewi Gita Wulandari

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Chairul G.Irianto

Pembimbing 2 : Tyas Kartika Sari

Subyek : Capacitors

Kata Kunci : installation preparation, overhead lines, planning

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TA_STE_062002004017_Halaman-Judul.pdf
2. 2022_TA_STE_062002004017_Lembar-Pengesahan.pdf
3. 2022_TA_STE_062002004017_Bab-1_Pendahuluan.pdf
4. 2022_TA_STE_062002004017_Bab-2_Tinjauan-Pustaka.pdf
5. 2022_TA_STE_062002004017_Bab-3_Metodologi-Penelitian.pdf
6. 2022_TA_STE_062002004017_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2022_TA_STE_062002004017_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2022_TA_STE_062002004017_Daftar-Pustaka.pdf
9. 2022_TA_STE_062002004017_Lampiran.pdf

R Revolusi industri menyebabkan seseorang harus bersaing dengan perubahan yang terjadi. Oleh karena itu dibutuhkan hardskill dan soft skill yang baik bagi para lulusan jurusan Teknik Elektro untuk beradaptasi dengan cepat dalam bidang pekerjaan terkait design sistem transmisi. Tugas akhir ini menjadi sarana menambah pengetahuan dan sebagai guidance dalam proses penyusunan dokumen perencanaan khususnya sistem transmisi tenaga listrik. Tujuan penelitian didedikasikan agar para pembaca dapat memahami perhitungan dan perencanaan konduktor, isolator serta andongan pada Saluran Udara Tegangan Tinggi 150kV sesuai dengan standar yang berlaku. Penelitian dapat digunakan sebagai sarana pembaca memahami proses persiapan sebelum instalasi Saluran Udara Tegangan Tinggi 150 kV dan menyusun dokumen perencanaan. Metode yang digunakan ialah studi literatur dan pengumpulan data dari penelitian yang sudah ada. Pengumpulan data didapatkan dari kontraktor yang memiliki ruang lingkup bisnis Engineering Procurement, Construction (EPC) pada SUTT 150kV. Objek penelitian Saluran Udara Tegangan Tinggi 150kV di daerah Perawang – Tenayan Provinsi Riau. Hasil akhir laporan ini berupa perhitungan perancangan saluran transmisi 150kV menggunakan konduktor jenis ACSR 250 mm2 ,current capacity 600 A mengalirkan tenaga listrik sejauh 21.38 km. Menggunakan isolator tipe glass 22 unit dan nilai andongan kurang dari standar minimum 10.65 m seharusnya minimun andongan ke tanah 11 m, langkah persiapan sebelum instalasi SUTT dan langkah penyusunan dokumen perencanaan.

T The industrial revolution causes a person to be able to compete with the changes that occur. Therefore, hard skills and soft skills are needed for graduates with electrical engineering majors to be able to adapt quickly in the field of work related to transmission system design. This final project is a means to be able to increase knowledge and as guidance in the process of preparing planning documents, especially in the electric power transmission system. The purpose of the study is dedicated so that readers can understand the calculation of the planning of conductors, insulators and sagging on the 150kV Overhead Line in accordance with applicable standards. This research can be used as a means for readers to understand the preparation process before the installation of the 150kV Overhead Line is carried out and compile planning documents. The method used is literature study and data collection from existing research. The data collection process itself is obtained from contractors who have the scope of the Engineering Procurement, Construction (EPC) business at the 150kV overhead line . The object of the study was the 150kV overhead line in the Perawang – Tenayan area of Riau Province. The final result of this report is in the form of calculations of the design of the 150kV transmission line using an ACSR type conductor of 250 mm2, the current capacity of 600 A delivers electric power as far as 21.38 km. Using a glass type insulator of 22 units and the value of andongan less than the minimum standard of 10.65 m should be minimun andongan to the ground 11 m, preparation steps before overhead line installation and steps for preparing planning documents.

Bagaimana Anda menilai Koleksi ini ?