DETAIL KOLEKSI

Perancangan dan penjadwalan tahapan penambangan batubara PIT 71N untuk memenuhi target produksi bulanan di PT Karunia Wahana JOB site PIK, Kaltim

4.0


Oleh : Ivan Delising

Info Katalog

Nomor Panggil : 721/TT/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Irfan Marwanza

Subyek : Coal mines and mining

Kata Kunci : mine planning, production scheduling, sequence, MineScape 5.7, XPAC 7.12

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STT_073001500056_Halaman-judul.pdf
2. 2020_TA_STT_073001500056_Pengesahan.pdf
3. 2020_TA_STT_073001500056_Bab-1_Pendahuluan.pdf
4. 2020_TA_STT_073001500056_Bab-2_Tinjauan-Umum.pdf
5. 2020_TA_STT_073001500056_Bab-3_Metodologi-Penelitian.pdf
6. 2020_TA_STT_073001500056_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2020_TA_STT_073001500056_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2020_TA_STT_073001500056_Daftar-Pustaka.pdf
9. 2020_TA_STT_073001500056_Lampiran.pdf

P PT Karunia Wahananusa selaku kontraktor dari PT Perkasa Inakakerta sudahmembuat rencana penambangan tahunan dan perlu dibagi menjadi rancana bulananagar mempermudah pengawasan dan pengelolaan produksi. Penelitian ini bertujuanuntuk merancang penjadwalan tahapan penambangan dan membuat desainsequence penambangan berdasarkan reancangan penjadwalan produksi yang telahdibuat untuk memenuhi target produksi bulanan pada PT KWN untuk periodeAgustus – Desmber 2019. PT PIK selaku pemegang PK2B membatasi untuk nisbahpengupasan yang di perbolehkan sebesar 9:1 dan sesuai dengan kemampuankapasitas alat yang tersedia. Pada penelitian ini dibutuhkan data – data sekunderdari perusahaan antara lain data topografi, model geologi, pit limit penambangan,jenis dan jumlah alat – alat mekanis, waktu kerja efektif dan rekomendasi lerengtambang. Pengolahan data pada penelitian ini menggunakan bantuan perangkatlunak MineScape 5.7 dan XPAC 7.12.Dimensi stripe dan block penambangan menggunakan ukuran 30m x 60m x 5meter.Berdasarkan rekomendasi geoteknik untuk geometri jenjang pada bagian low walldengan tinggi jenjang 10 m, lebar jenjang 10 m dan slope 30°, pada sisi high walldengan tinggi jenjang 10 m, lebar jenjang, 5 m dan slope 55°. Rancangan lebar jalanlurus minimum 12 m, lebar jalan pada tikungan 25 meter dengan grade maksimum10%. Hasil Rancangan bulan Agustus 2019, volume overburden 940.282 bcm danbatubara tertambang 109.443 ton, dengan stripping ratio 8,59. Bulan September2019, volume overburden 1.042.428 bcm dan batubara tertambang 116.042 ton,stripping ratio 8,98. Bulan Oktober 2019, volume overburden 859.893 bcm danbatubara tertambang 105.959 ton, stripping ratio 8,12. Bulan November 2019,volume overburden 894.559 bcm dan batubara tertambang 103.546 ton, strippingratio 8,64. Bulan Desember 2019, volume overburden 782.613 bcm dan batubaratertambang 91.119 ton, stripping ratio 8,61. Total volume overburden 4.519.777bcm dengan perolehan batubara tertambang 526.110 ton, dengan nilai strippingratio sampai batas akhir penambangan sebesar 8,59:1.

P PT Karunia Wahananusa as a contractor PT Perkasa Inakakerta has made anannual mining plan and needs to be divided into monthly plans to facilitate thesupervision and management of production. This study aims to design thescheduling of the mining stages and design the mining sequence design based onproduction scheduling that has been made to meet the monthly production targetsat PT KWN for the period August - December 2019. PT PIK as the PK2B holderlimits for allowable stripping ratio of 9:1 and according to the capacity of theavailable tool capacity. In this research, secondary data from companies are needed,including topographic data, geological models, mining pit limits, types and amountsof mechanical equipment, effective working time and mine slope recommendations.Data processing in this study using MineScape 5.7 and XPAC 7.12 software.Dimensions of mining stripe and blocks use a size of 30m x 60m x 5 meters. Basedon geotechnical recommendations for level geometry at the low wall with a heightof 10m, width of 10m and slope 30 °, on the side of the high wall with a height of10 m, width of 5 m and slope 55 °. Design a minimum straight road width of 12 m,width of the road at a 25 meter bend with a maximum grade of 10%. The draftresults for August 2019, the volume of overburden 940.282 bcm and coal mined109.443 tons, with a stripping ratio of 8,59. In September 2019, overburden volume1.042.428 bcm and 116.042 tons of mined coal, stripping ratio 8,98. In October2019, the volume of overburden 859.893 bcm and coal mined 105.959 tons,stripping ratio 8,12. In November 2019, the volume of overburden 894.559 bcmand coal mined 103.546 tons, stripping ratio 8,64. In December 2019, overburdenvolume was 782.613 bcm and coal was 91.119 tons, stripping ratio was 8,61. Thetotal volume of overburden 4,519,777 bcm with the acquisition of 526,110 tons ofmined coal, with a stripping ratio up to the mining deadline of 8,59:1.

Bagaimana Anda menilai Koleksi ini ?