DETAIL KOLEKSI

Analisis penanganan banjir dan genangan kawasan Cidawolong Kecamatan Majalaya, Kabupaten Bandung


Oleh : Syarifah Turahmah

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Sih Andayani

Subyek : Civil engineering - Analysis of flood handling

Kata Kunci : polder system, storage, normalizing the channel

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 1.2019_TA_TS_051001500114_Halaman-judul.pdf 18
2. 2.2019_TA_TS_051001500114_Bab-1.pdf 3
3. 3.2019_TA_TS_051001500114_Bab-2.pdf
4. 4.2019_TA_TS_051001500114_Bab-3.pdf
5. 5.2019_TA_TS_051001500114_Bab-4.pdf
6. 6.2019_TA_TS_051001500114_Bab-5.pdf
7. 7.2019_TA_TS_051001500114_Daftar-pustaka.pdf 1
8. 8.2019_TA_TS_051001500114_Lampiran.pdf

B Banjir dan genangan yang terjadi di Kawasan Cidawolong telah menjadi permasalahan berkesinambungan. Frekuensi banjir mencapai 10 kali/tahun dengan luas genangan lebih kurang 12 ha dan tinggi genangan berkisar 0,3 sampai 1,5 m. Upaya penanganannya digunakan sistem polder yang komponennya terdiri dari kolam tampungan, pompa dan menormalisasi saluran. Analisis meliputi analisis hidrologi, analisis hidrolika, dan kapasitas kolam tampungan dan pompa. Berdasarkan analisis tersebut sistem polder dapat diterapkan untuk mengatasi banjir dengan mendesain kolam tampungan dan menormalisasi saluran atau sungai yang berada dikawasan tersebut. Berdasarkan analisis hidrologi diperoleh debit banjir, dalam memperhitungkan debit banjir rencana dengan kala ulang 5 tahun diperoleh debit berkisar 7,897 m3/detik – 36,898 m3/detik. Berdasarkan analisis hidrolika diperoleh ukuran dimensi saluran normalisasi dengan kala ulang 5 tahun, menggunakan saluran berbentuk segi empat dengan pasangan batu kali diperoleh dimensi lebar saluran berkisar 3,5 m – 12 ,4 m dengan kedalaman air 1,5 m. Berdasarkan analisis kapasitas kolam tampungan dan pompa dengan luas kolam tampungan 49744 m2 diperoleh kapasitas tampungan 114566,54 m3, kala ulang 5 tahun dan kedalaman air kolam tampungan 2,9 m.

F Floods and inundations that occur in the Cidawolong area have become a continuous problem. The frequency of floods reaches 10 times / year with an area of inundation about 12 hectares and a high of inundation range 0.3 to 1.5 m. The handling effort is used polder system whose components consist of storage, pumps, and normalizing the channel. The analysis includes hydrological analysis, hydraulic analysis, and the capacity of storage and pumps. Based on this analysis, a polder system can be applied to overcome flooding by designing a polder pool and normalizing the channel or river in the area. Based on the hydrological analysis, it is obtained the flood discharge, in calculating the planned flood discharge with a return period of 5 years obtained the discharge ranges from 7,897 m3 / sec - 36,898 m3 / sec. Based on the hydraulics analysis, the dimensions of the normalization channel are obtained with a return period of 5 years, using a rectangular shaped channel with a pair of river stones, the dimensions of the channel width range from 3.5 m - 12, 4 m with the depth of water is 1.5 m. Based on the analysis of the capacity of storage and pumps with 49744 m2 storage’s areas, the reservoir capacity of 114566,54 m3 is obtained, at 5 years period time, and the depth of the storage is 2.9 m.

Bagaimana Anda menilai Koleksi ini ?