DETAIL KOLEKSI

Penentuan estimated ultimate recovery dan remaining reserve dengan metode decline curve pada lapisan F dan F-01 lapangan FLG


Oleh : Fiona Delani

Info Katalog

Nomor Panggil : 912/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Lestari Said

Pembimbing 2 : Onnie Ridaliani

Subyek : Petroleum engineering - Estimated ultimate recovery

Kata Kunci : decline curve analysis, remaining reserve, recovery factor

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_07112089_Halaman-Judul.pdf
2. 2018_TA_TM_07112089_Bab-1.pdf 2
3. 2018_TA_TM_07112089_Bab-2.pdf
4. 2018_TA_TM_07112089_Bab-3.pdf
5. 2018_TA_TM_07112089_Bab-4.pdf
6. 2018_TA_TM_07112089_Bab-5.pdf
7. 2018_TA_TM_07112089_Daftar-pustaka.pdf 1
8. 2018_TA_TM_07112089_Lampiran.pdf

P Penentuan Estimated Ultimate Recovery (EUR) dan Remaining Reseve (RR)yang dilakukan untuk Lapangan FLG adalah dengan menggunakan metode DeclineCurve Analysis (DCA). Lapisan yang dianalisa pada lapangan FLG ini terdiri darilapisan F, dan F-01. Untuk metode decline curve analysis pada lapangan FLGmenggunakan dua metode yaitu metode Trial Error and 𝑋2-Chisquare Test dananalisis dengan menggunakan Oil Field Manager (OFM) Software. Tujuan darianalisa Decline Curve pada penelitian ini adalah untuk mengetahui nilai EstimatedUltimate Recovery (EUR), Remaining Reserve (RR), serta Recovery Factor (RF)serta memperkirakan sampai kapan lapangan FLG dapat berproduksi. Hasil yangdidapatkan dari metode Trial Error And 𝑋2-Chisquare Test dan analisis denganmenggunakan Oil Field Manager (OFM) software ini pada lapisan F, dan F-01berturut-turut untuk hasil estimated ultimate recovery adalah 3418,376 MSTB dan3428,350 MSTB serta 474,774 MSTB dan 477,255 MSTB. Hasil RemainingReserve (RR) lapisan F dan F-01 dengan ketentuan qlimit 10 STB/d persumurmenggunakan metode Trial Error & 𝑋2 Chisquare’s Test dan software OFMberturut-turut adalah 773,286 MSTB dan 783,265 MSTB serta 151,95 MSTB dan154,434 MSTB. Recovery Factor (RF) pada lapisan F dan F-01 didapatkan dariperbandingan harga Estimated Ultimate Recovery (EUR) terhadap Original Oil inPlace (OOIP) dalam satuan persen dengan metode Trial Error & 𝑋2 Chisquare’sTest dan software OFM berturut-turut adalah 37,82% dan 37,93% serta 22,13% dan22,24%.

T The calculation of the ultimate recovery (EUR) and remaining oil reserves(RR) for FLG Field are using the Decline Curve Analysis (DCA) method. Thelayer analyzed in this FLG field consists of layer F, and F-01. For the declinecurve analysis method on FLG field uses two methods, Trial Error and 𝑿𝟐 -Chisquare Test and analysis methods using Oil Field Manager (OFM) Software.The purpose of the Decline Curve analysis in this study is to determine the valueof Estimated Ultimate Recovery (EUR), Remaining Reserve (RR), and RecoveryFactor (RF) and to estimate when FLG Field can produce. The results obtainedfrom the Trial Error And 𝑿𝟐-Chisquare Test method and analysis using the OilField Manager (OFM) software are in layers F, and F-01 each obtained theultimate recovery (EUR) value of 3418,376 MSTB and 474,774 MSTB with thetrial error and 𝑿𝟐-chisquare test method; 3428,350 MSTB and 477,255 MSTBusing OFM software. Then the remaining reserve (RR) values are 773,286 MSTBand 151,95 MSTB using the trial error and 𝑿𝟐-chisquare test methods; 783,265MSTB and 154,434 MSTB using OFM software. And for recovery factors (RF)obtained by 37,82% and 11,29% with the trial error and 𝑿𝟐 -chisquare testmethods; 37,93% MSTB and 11,35% MSTB obtained from analysis using OFMsoftware.

Bagaimana Anda menilai Koleksi ini ?