DETAIL KOLEKSI

Perencanaan casing pemboran dengan menggunakan metode maximum load pada sumur kw-33 lapangan vikendi

5.0


Oleh : Kiki Widyanata

Info Katalog

Nomor Panggil : 1124/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Apriandi Rizkina

Subyek : Petroleum engineering - Drilling well

Kata Kunci : maximum load, grade casing, top down method.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071001500070_Halaman-judul.pdf 15
2. 2019_TA_TM_071001500070_Bab-1.pdf
3. 2019_TA_TM_071001500070_Bab-2.pdf
4. 2019_TA_TM_071001500070_Bab-3.pdf
5. 2019_TA_TM_071001500070_Bab-4.pdf
6. 2019_TA_TM_071001500070_Bab-5.pdf
7. 2019_TA_TM_071001500070_Daftar-pustaka.pdf
8. 2019_TA_TM_071001500070_Lampiran.pdf

S Salah satu kegiatan pemboran yang berfungsi untuk mencegahpermasalahan pemboran berupa permasalahan pipa terjepit, hilang sirkulasi,semburan liar, dan keruntuhan dinding sumur adalah kegiatan pemasangan casing.Pada tugas akhir ini akan ditinjau mengenai perencanaan casing pada sumur “KW-33” untuk mengetahui apakah rangkaian casing tersebut sudah merupakan pilihanyang paling efektif dan efesienMetoda yang digunakan pada desain casing, diawali dengan penentuan titikkedalaman casing menggunakan metode top down method. Pada top down methodakan dilakukan perhitungan mengenai tekanan formasi, tekanan lumpur pemboranyang digunakan dan juga tekanan rekah formasi yang akan di tembus pada saatmelakukan pemboran, kemudian dilanjutkan dengan dilakukan dengan pemilihancasing dengan menggunakan metoda maximum load terhadap grade casing yangdigunakan pada sumur “KW-33”.Perhitungan yang digunakan dalam evaluasi ini adalah metode MaximumLoad untuk menghitung beban burst, collapse, tension, dan biaxial denganmenggunakan korelasi yang ada pada tekanan-tekanan tersebut maka dapat dilakukan pemilihan grade casing yang akan digunakan pada sumur pemborantersebut dan kemudian dari korelasi itu juga akan dilakukan evaluasi terhadapcasing yang paling efektif dan efisien.Pada perencanaan desain casing yang dilakukan pada sumur KW-33didapatkan grade casing yang paling efektif dan efisien diantaranya pada casing 7”digunakan grade S-95; 29 ppf, pada casing 9 5/8” digunakan grade S-95; 53,5 ppf,pada casing 13 3/8 digunakan grade S-95; 68 ppf, pada casing 20” digunakan gradeJ-55; 106,5 ppf.

T This drilling operation itself aims to make pathways so that oil and gas canbe manufactured or is lifted to the surface. One of the drilling activity that servesto prevent problems of drilling be pinched pipe problems, lost circulation, bursts ofwild, and slogging hole is an activity the installation casing. On this finalassignment will be reviewed regarding the planning of the casing at the well's 'KW-33' to find out if the casing circuit is already a selection of the most effectiveand efficient.Starting point with the determination of the depth of casing using a top downmethod. On top down method of calculation will be done regarding the formationpressure, the pressure of the drilling mud is used and also fracturing the formationpressure will be in see-through at the time of drilling, then proceed with theevaluation done and optimizations against grade casing used on the well ' KW-33'.The calculations used in this evaluation is Maximum Load Method tocalculate load burst, collapse, tension, and biaxial using correlation existed atpressures that can do the selection grade casing which will used in the drilling ofthe well and then from the correlation will also be evaluated against the casingwhich is the most effective and efficient.On well casing design planning at ‘KW-33’was obtained the most effectiveand efficient on casing 7” used grade S-95;29 ppf, on casing 9 5/8” used grade S-95”;53,5 ppf, on casing 13 3/8” used grade S-95;68 ppf, on casing 20” used gradeJ-55;106,5 ppf.

Bagaimana Anda menilai Koleksi ini ?