DETAIL KOLEKSI

Rancangan tahapan penambangan batubara PIT 3 bulan Januari dan Februari 2019 PT Dizamatra Powerindo Lahat, Sumsel

2.3


Oleh : I Dewa Putu Deo Setyawan

Info Katalog

Nomor Panggil : 708/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Bani Nugroho

Subyek : Mining engineering;Coal mines and mining

Kata Kunci : Minescape 5.7, Xpac 7.14, design, block model optimization

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001400049_Halaman-judul.pdf
2. 2019_TA_TB_073001400049_BAB-1.pdf
3. 2019_TA_TB_073001400049_BAB-2.pdf
4. 2019_TA_TB_073001400049_BAB-3.pdf
5. 2019_TA_TB_073001400049_BAB-4.pdf
6. 2019_TA_TB_073001400049_BAB-5.pdf
7. 2019_TA_TB_073001400049_Daftar-pustaka.pdf
8. 2019_TA_TB_073001400049_Lampiran.pdf

R Rancangan tahapan penambangan merupakan bentuk penambangan yangmenunjukan bagaimana suatu pit akan ditambang awal hingga tahap akhirrancangan tambang (pit limit). Perusahaan PT Dizamatra Powerindo akanmembagi rancangan desain triwulan, menjadi rancangan pit periode bulanansehingga diperlukan rancangan tahapan penambangan yang sesuai dengan nilaistripping ratio rencana pada bulan Januari dan Februari 2019 sebesar 1,5 : 1dengan target produksi batubara yang sesuai terhadap kapasitas produksi alatgali-muat tersedia.Tujuan dari penelitian ini adalah untuk merancang sequencepenambangan serta mengetahui estimasi tonase batubara dan volume tanahpenutup (overburden) berdasarkan sequence penambangan periode bulan Januari– Februari 2019. Pada penelitian ini dibutuhkan data-data sekunder dariperusahaan seperti peta topografi, model geologi, rekomendasi lereng, batas pitlimit, target produktivitas alat gali-muat, waktu kerja efektif, jenis dan jumlah alatmekanis. Analisis data dan rancangan tahapan penambangan pada penelitian inimenggunakan software Minescape 5.7 dan Xpac 7.14Dimensi stripe dan block penambangan menggunakan ukuran 52m x29m x4m.Rancangan geometri jenjang untuk pit pada bagian low wall atau dinding tambangpada sisi terdangkal dengan tinggi jenjang 10 m, lebar jenjang 15 m dan slope20°, pada sisi high wall atau dinding tambang pada sisi kimiringan batubaraterdalam dengan tinggi jenjang 10 m, lebar jenjang, 5 m dan slope 50°. Rencanajalan, lebar jalan pada kondisi lurus minimum 19 m, lebar jalan angkut padatikungan 22,3 meter dan grade maksimum 10%. Rancangan bulan Januari 2019dengan target elevasi pada RL 66, RL 42, dan RL 38, batubara tertambang286.989,48 ton dan volume batuan penutup 475.173,98 bcm, dengan nisbahpengupasan 1,66 : 1. Rancangan bulan Februari 2019 dengan target elevasi padaRL 35 dan RL 25, batubara tertambang 249.944,20 ton, volume batuan penutup360.687,74 bcm, dengan nisbah pengupasan 1,44 : 1. Total cadangan batubaratertambang 536.933,70 ton dan total volume pengupasan lapisan tanah penutupadalah 835.861,70 bcm.

M Mining stage design is a form of mining that shows how a pit will be mined early to the final stage of a mine design (pit limit). The company PT Dizamatra Powerindo will divide quarterly design, into monthly period pit designs so that the required mining stage design is in accordance with the plan stripping ratio value in January and February 2019 of 1.5: 1 with the coal production target that is in line with the production capacity of the digging equipment -load available. The purpose of this study is to design the mining sequence and determine the estimated tonnage of coal and overburden volume based on the mining sequence for the period January - February 2019. In this study secondary data from companies such as topographic maps, models geology, slope recommendations, pit limit, digging load productivity target, effective working time, type and number of mechanical devices. Data analysis and mining stage design in this study using Minescape 5.7 and Xpac 7.14 softwareDimensions of stripe and mining blocks use a size of 52m x29m x4m. Level geometry design for pits on the low wall or mine wall on the shallow side with a height of 10 m, width 15 m and a slope of 20 °, on the high wall or mine wall on the side of the deepest coal slope with a height of 10 m, level width , 5 m and 50 ° slope. The planned road, the width of the road in a minimum straight condition of 19 m, the width of the haul road at a bend of 22.3 meters and a maximum grade of 10%. January 2019 draft with elevation targets at RL 66, RL 42, and RL 38, mined coal 286,989.48 tons and cover rock volume 475,173.98 bcm, with stripping ratio 1.66: 1. The February 2019 design with elevation target at RL 35 and RL 25, 249,944.20 tons of mined coal, cover volume of 360,687.74 bcm, with stripping ratio 1.44: 1. Total reserves of mined coal are 536,933.70 tons and the total stripping volume of overburden is 835,861.70 bcm .

Bagaimana Anda menilai Koleksi ini ?