DETAIL KOLEKSI

Evaluasi pompa dan saluran terbuka untuk mencapai target pengeringan sump di pit 3 barat banko barat PT Bukit Asam Tbk.


Oleh : Easton Purwosubroto

Info Katalog

Nomor Panggil : 588/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Reza Aryanto

Pembimbing 2 : Christin Palit

Subyek : Mining Engineering;Use of diesel fuel

Kata Kunci : sump, drying, pumps, open channels.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TB_073001300028_Halaman-Judul.pdf
2. 2018_TA_TB_073001300028_BAB-1.pdf
3. 2018_TA_TB_073001300028_BAB-2.pdf 24
4. 2018_TA_TB_073001300028_BAB-3.pdf
5. 2018_TA_TB_073001300028_BAB-4.pdf 15
6. 2018_TA_TB_073001300028_BAB-5.pdf
7. 2018_TA_TB_073001300028_Daftar-Pustaka.pdf
8. 2018_TA_TB_073001300028_Lampiran.pdf 27

P PT Bukit Asam mempunyai beberapa area penambangan yang salah satunya adalah pit 3 Barat Banko Barat. PT Bukit Asam menerapkan sistem tambangterbuka dalam kegiatan penambangannya yang akan membentuk cekungan yang cukup besar sehingga air akan terkumpul pada cekungan tersebut. Keberadaan airini dapat mengganggu kegiatan penambangan sehingga air yang berada di sump iniharus dikeluarkan. Pada evaluasi pit 3 Barat curah hujan direncanakan 3,6 mm/jamdengan intensitas 30.62 mm/jam dengan total debit limpasan 8.609 m3/hari. Untukmengatasinya air dibiarkan masuk dan ditampung oleh sump yang kemudiandikeluarkan oleh pompa dengan tujuan untuk dikeringkan. Pengeringan dengankondisi aktual dilakukan memompakan air keluar dari sump dengan total headpompa 25 meter, debit 416 m3/jam, RPM 700, dengan 16 jam operasi pompa perharinya dan 1 unit pompa KSB DND 200 belum dapat mencapai target pengeringansump yang hanya dalam waktu 4 bulan. Setelah dilakukan evaluasi terhadap kinerjapompa, yaitu peningkatan RPM pompa, serta jam operasi pompa, maka untukmencapai target pengeringan perlu adanya penambahan 1 unit pompa KSB DND200 dengan debit pada masing-masing pompa sebesar 1.050 m3/jam, RPM 1400,head pompa 108 meter, efisiensi pompa 79%, dan jam operasi pompa 22 jam/harinya. Setelah mengetahui seberapa besar debit air yang akan dipompa menujusaluran terbuka, maka dimensi saluran dapat ditentukan. Berdasarkan debit air totalyang dipompa mencapai 2.100 m3/jam atau 0,583 m3/detik, dimensi salurandirencanakan sebagai berikut: lebar dasar saluran (b) 0,526 meter, lebar permukaansaluran (B) 1,052 meter, tinggi sisi saluran (a) 0,526 meter, tinggi jagaan (f) 0,068meter dan tinggi saluran 0,524 meter. Selanjutnya pengkajian biaya dilihat dari jamkerja pompa per harinya dapat diketahui besar pemakaian solar selama prosespengeringan sebesar 222.058 liter, dengan biaya sewa pompa dan poonton sebesarRp. 3.088.800.000 dengan biaya pemakaian solar Rp. 1.831.977.991 sehingga totalbiaya operasional pompa Rp. 4.920.777.991 selama waktu pengeringan 117 hari.

P PT Bukit Asam has several mining areas, one of which is the west 3 Bankopit. PT Bukit Asam applies an open pit system in its mining activities which willform a basin that is large enough to accumulate water in it. The existence of thiswater can disrupt mining activities, so that the water must be removed. In the pit 3west evaluation, rainfall was planned 3,6 mm/hour with an intensity of 30,62mm/hour with a total runoff discharge of 8.609 m3/day. To overcome this problem,the water is allowed to enter and collected by the sump which is then sucked by thepump for the purpose of drying. Drying with actual conditions was carried outpumping water out of the sump with a total pump head of 25 meters, RPM 700,discharge flowrate of 416 m3/hour with 16 hours of pump operation per day andwith 1 unit of KSB DND 200 pump can not reach the sump drying target within 4months. After an evaluation of the pump’s performance, which is increasing thepump flowrate and pump operating hours. So to achieve the drying target, it isnecessary to add 1 more unit of KSB DND 200 pump with a flowrate discharge ateach pump 1.050 m3/hour, with a pump head of 108 meters, RPM 1400, efficiencyof pump 79%, and pump operating hours of 22 hours/day. After knowing how muchwater flow will be pumped to the open channel, the channel dimensions can bedetermined. Based on the total water discharge pumped 2.100 m3/hour or 0,583m3/second, the channel dimensions are planned as follow: channel base width0,526 meters, channel surface width 1,052 meters, channel side height 0,526meters, guard height 0,068 meters, and channel height of 0,524 meters.Furthermore, the assessment of costs seen from the working hours of the pump perday it can be seen that the use of diesel fuel during the drying proess is 222.058liters, with the cost of pumps and poonton rent at Rp. 3.088.800.000, with a dieselfuel usage costs Rp. 1.831.977.991 so the total operating costs of the pump Rp.4.920.777.991 during a drying time of 117 days.

Bagaimana Anda menilai Koleksi ini ?