DETAIL KOLEKSI

Pemodelan differential relay pelanggan khusus kawasan Sudirman Central Busines District


Oleh : Najmi Fushila Madina

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Chairul G. Irianto

Pembimbing 2 : Maula Sukmawidjaya

Subyek : Electric relays

Kata Kunci : differential relay, SAIDI, ETAP 12.6, sudirman central bussines district

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STE_062001700516_Halaman-Judul.pdf
2. 2020_TA_STE_062001700516_Lembar-Pengesahan.pdf 4
3. 2020_TA_STE_062001700516_Bab-1_Pendahuluan.pdf 5
4. 2020_TA_STE_062001700516_Bab-2_Tinjauan-Pustaka.pdf
5. 2020_TA_STE_062001700516_Bab-3_Metodologi-Penelitian.pdf
6. 2020_TA_STE_062001700516_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2020_TA_STE_062001700516_Bab-5_Kesimpulan.pdf
8. 2020_TA_STE_062001700516_Daftar-Pustaka.pdf 4
9. 2020_TA_STE_062001700516_Lampiran.pdf

P Pemanfaatan rele diferensial ini diterapkan pada gardu distribusi untuk setiappenyulang. Rele diferensial menggunakan komunikasi kabel fiber optik untukkoordinasi rele antar gardu. Waktu kerja rele diferensial akan berpengaruh padadurasi trip penyulang yaitu 0,01 detik dalam melokalisir gangguan yang akanterjadi. Hasil penerapan rele diferensial pada Kawasan Sudirman Central BusinesDistrict berpengaruh pada SAIDI (System Average Interruption Duration Index)yaitu 0,00 menit/pelanggan yang artinya tidak terjadi pemadaman pada pelanggandikarenakan durasi padam yaitu 0. Perencanaan pemasangan rele diferensialdilakukan pada penyulang yang spindel dan pelanggan premium yangmembutuhkan pelayanan tanpa padam. Kehandalan penyulang SCBD meningkatmenjadi 99% ketika perencanaan ini dilakukan. Adanya perubahan padakonfigurasi jaringan penyaluran listrik 20 kV yang awalnya spindel menjadilooping. SAIDI kawasan Sudirman Central Business District terjadi penurunanyang awalnya 24,97 menit/pelanggan menjadi 0,024 menit/pelanggan danrecovery time saat terjadi gangguan meningkat drastic dari 549 menit menjadi0.003 menitBenefit yang dirasakan tidak lain adalah penurunan angka padam pada setiappelanggan, karena pelanggan di supply dari 2 penyulang berbeda.

D Differential relay is applied to the distribution substation for each feeder.Differential relay uses fiber optic cable communication for relay coordinationbetween substations. The differential relay working time will affect the duration ofthe feeder trip which is 0.01 seconds in localizing the interference that will occur.The results of the application of differential relays in the Sudirman CentralBusiness District have an effect on SAIDI that is 0,00 minutes/customer, whichmeans there is no blackout on the customer due to the duration of the outage thatis 0 minutes/customer. Differential relay installation planning is carried out onspindle feeders and premium customers who need uninterrupted service. Thereliability of SCBD feeders increased to 99% when this planning was done. Thereis a change in the configuration of the 20 kV electrical distribution network,which initially spindles into looping. SAIDI in the Sudirman Central BusinessDistrict area decreased initially from 24.97 minutes/customer to 0.024minutes/customer and recovery time when disturbance increased dramaticallyfrom 549 minutes to 0.003 minutes. The perceived benefit is nothing but adecrease in the number of outages for each customer because the customer issupplied from two different feeders.

Bagaimana Anda menilai Koleksi ini ?