DETAIL KOLEKSI

Analisis keterlambatan proyek dengan konsep earned value analysis pada proyek instalasi pipa boiler PT Argha Karya Prima Industry Tbk


Oleh : Rangga Sandriawan

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Bambang Endro Yuwno

Subyek : Construction industry

Kata Kunci : earned value analysis, delay, cost performance, schedule performance

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STS_051001600110_Halaman-Judul.pdf
2. 2021_TA_STS_051001600110_Lembar-Pengesahan.pdf
3. 2021_TA_STS_051001600110_Bab-1_Pendahuluan.pdf
4. 2021_TA_STS_051001600110_Bab-2_Tinjauan-Pustaka.pdf
5. 2021_TA_STS_051001600110_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_STS_051001600110_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2021_TA_STS_051001600110_Bab-5_Kesimpulan.pdf
8. 2021_TA_STS_051001600110_Daftar-Pustaka.pdf
9. 2021_TA_STS_051001600110_Lampiran.pdf

P PT Argha Karya Prima Tbk merupakan sebuah perusahaan ternama berstatus Tbk (terbuka) yang bergerak dalam bidang flexible packaging yang telah beroprasi sejak 1980an dan sudah bersertiifikat ISO 9001:2008. (PT Argha Karya Prima Industry Tbk, n.d.). Untuk menjaga kualitas dan meningkatkan produksinya perlu dilakukan penambahan dan pergantian pipa boiler sebagai pelebur bijih pelastik. PT Gerbang Abadi Baru sebagai kontraktor mengalami kendala dalam pelaksanaan proyek tersebut, yaitu dikarenakan kegiatan produksi perusahaan masih berjalan dan malah terjadi peningkatan produksi yang signifikan. Maka dari itu proses berlangsungnya proyek menjadi terganggu dan terindikasi menjadi terlambat. Hal tersebut tidak diperkirakan dan tidak sesuai dengan kontrak awal yang dibuat,maka dari itu keterlambatan tersebut mengharuskan kontraktor melakukan pengendalian dengan melakukan perubahan penjadwalan dan biaya. Penelitian ini bertujuan untuk mengetahui kinerja biaya dan kinerja waktu dari proyek tersebut, metode yang digunakan adalah metode Earned Value Analysis . Hasil akhir yang diharapkan adalah mengetahui kinerja biaya dan waktu pada saat peninjauan serta perbandingan perhitungan kinerja biaya dan waktu pada saat kondisi eksisting (Kondisi R1) dengan kondisi yang telah dibuatkan simulasi penjadwalan dan biaya yang baru setelah menyesuaikan kendala yang terjadi (Kondisi R2). Setelah dilakukan simulasi penjadwalan dan biaya dengan menyesuaikan kendala yang terjadi, didapatkan hasil perbandingan Earned Value pada kondisi R2 lebih baik, dari hasil Schedule Performance Index (SPI) didapatkan hasil SPI>1 yang menandakan proyek berjalan lebih cepat dari rencana dan hasil Cost Performance Index (CPI) didapat hasil CPI > 1 yang menandakan biaya tidak melebihi biaya yang di anggarkan.

P PT Argha Karya Prima Tbk is a well-known company with the status of Tbk (open) which is engaged in flexible packaging which has been operating since the 1980s and is ISO 9001:2008 certified. (PT Argha Karya Prima Industry Tbk, n.d.). To maintain quality and increase production, it is necessary to add and replace boiler pipes as plastic ore smelters. PT Gerbang Abadi Baru as a contractor experienced problems in implementing the project, that is because the company's production activities were still running and there was a significant increase in production. Therefore, the process of the project is disrupted and is indicated to be late. This was unexpected and not in accordance with the initial contract, therefore the delay required the contractor to do control by making changes to scheduling and costs. This study aims to determine the cost performance and time performance of the project, the method used is the Earned Value Analysis method. The final result that is expected is to know the cost and time performance at the time of the review as well as the comparison of the calculation of the cost and time performance during the existing conditions ( Condition R1) with the conditions for which a new scheduling and cost simulation has been made after adjusting the constraints that occur ( Condition R2). After doing a scheduling and cost simulation by adjusting the constraints that occur, the results of the comparison of Earned Value in ideal conditions are better, from the results of the Schedule Performance Index (SPI) the results of SPI> 1 indicate that the project is running faster than planned and the results of the Cost Performance Index (CPI) results obtained CPI> 1 which indicates the cost does not exceed the budgeted cost.

Bagaimana Anda menilai Koleksi ini ?