DETAIL KOLEKSI

Problem pipa terjepit, penanggulangan pencegahannya pada sumur S-7 di lapangan S

5.0


Oleh : Ray Giovanni Agustinus Lumbantobing

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Ali Sundja

Subyek : Drilling;Pipe drilling circuits sandwiched

Kata Kunci : drilling operations, sandwiched drill pipe, wells S-7

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112180_Halaman-judul.pdf -1
2. 2016_TA_TM_07112180_Bab-1.pdf
3. 2016_TA_TM_07112180_Bab-2.pdf
4. 2016_TA_TM_07112180_Bab-3.pdf
5. 2016_TA_TM_07112180_Bab-4.pdf
6. 2016_TA_TM_07112180_Bab-5.pdf
7. 2016_TA_TM_07112180_Bab-6.pdf
8. 2016_TA_TM_07112180_Daftar-pustaka.pdf 1
9. 2016_TA_TM_07112180_Lampiran.pdf

D Dalam melakukan operasi pemboran tidak selalu berjalan sesuai seperti yang sudah direncanakan. Kadangkala terjadi masalah-masalah yang mengganggu operasi pemboran dan sangat merugikan. Salah satu masalah yang terjadi pada saat operasi pemboran sumur S-7 berlangsung adalah terjepitnya rangkaian pipa bor (stuck pipe) yang disebabkan oleh Differential Sticking dan Hole Packed Off. Penanganan terjepitnya rangkaian pipa bor memerlukan tenaga, waktu, serta biaya tambahan dan hal tersebut sangat merugikan. Masalah terjepitnya rangkaian pipa bor (stuck pipe) pada sumur S-7 di lapangan S ini terjadi pada saat pemboran lubang 12 ¼” dan lubang 8 ½”. Beberapa faktor yang menyebabkan terjepitnya rangkaian pipa bor adalah kurangnya waktu dilakukannya sirkulasi sehingga cutting tidak terangkat sempurna, formasi yang ditembus unconsolidated, dan faktor kemiringan sumur (inklinasi) yang tinggi. Upaya yang dilakukan untuk melepas rangkaian pipa bor yang terjepit diantaranya adalah metode jarring (jar up-jar down), metode perendaman (spotting fluids), metode mechanical back off. Apabila metode-metode tersebut tidak berhasil untuk melepaskan rangkaian pipa yang terjepit, maka rangkaian pipa diputus dengan metode back off shot. Setelah rangkaian pipa diputus, dilakukan usaha pemancingan (fishing job). Setelah fishing job dilakukan namun gagal, maka dilakukan penyemenan kemudian untuk dilakukan sidetrack.

I In conducting drilling operations do not always go according as planned. It is sometimes the problems that interfere with drilling operations and are very detrimental. One of the problems that occur during the drilling operationsunderway S-7 is a series of sandwiched drill pipe (stuck pipe) caused byDifferential Sticking and Hole Packed Off. To handling a series of sandwicheddrill pipe requires energy, time, and the extra cost and it is very harmful.Problems a series of sandwiched drill pipe (stuck pipe) in wells S-7 in field S is happening at the time of drilling holes 12 ¼ "and hole 8 ½". Some of the factors that cause entrapment drill pipe circuit is the lack of time does circulation so that cutting is not lifted well, penetrated unconsolidated formations, and wellsslope factor (high deviated). Efforts are being made to release a series of sandwiched drill pipe including the method of jarring (jar jar up-down), the submersion method (spotting fluids), mechanical back off method. If these methods do not succeed to release a series of sandwiched drill pipe, then a series of disconnected pipe by the method of back off shots. After a series of disconnected pipe, do fishing effort (fishing job). After fishing job done but failed, then do cementing then to do sidetrack.

Bagaimana Anda menilai Koleksi ini ?