DETAIL KOLEKSI

Perencanaan desain electrical submersible pump pada lapangan DKSS


Oleh : M. Reza Al Fariz

Info Katalog

Nomor Panggil : 367/TP/2016

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Djoko Sulistyanto

Subyek : Electrical submersible pump;Electric submersible pump design

Kata Kunci : well, Pertamina, electric submersible pump

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07111218_Halaman-judul.pdf
2. 2016_TA_TM_07111218_Bab-1.pdf
3. 2016_TA_TM_07111218_Bab-2.pdf
4. 2016_TA_TM_07111218_Bab-3.pdf
5. 2016_TA_TM_07111218_Bab-4.pdf
6. 2016_TA_TM_07111218_Bab-5.pdf
7. 2016_TA_TM_07111218_Bab-6.pdf
8. 2016_TA_TM_07111218_Daftar-pustaka.pdf
9. 2016_TA_TM_07111218_Lampiran.pdf

L Lapangan DKSS merupakan salah satu lapangan minyak dan gas yangdikelola oleh PT Pertamina EP Asset 3. Sumur M, R dan A yang berlokasi diLapangan DKSS tersebut masih merupakan sumur sembur alam / natural flow.Pertimbangan dari Lapangan DKSS akan dilakukan pemasangan ElectricSubmersible Pump (ESP) pada ketiga sumur tersebut. Dengan catatan laju aliryang digunakan adalah 80% dari laju alir maksimal (Qmax) dan water cut dianggap tetap. Ketiga sumur yang dikaji di lapangan DKSS ini memiliki water cut yang lumayan besar (diatas 50 %). Berkaitan dengan hal tersebut maka penggambaran kurva IPR akan menggunakan metode komposit. Setelah itu akan dihitung nilai free gas di dalam pompa dan akan mendapatkan volume total di pompa untuk menentukan jenis pompa. Sumur M menggunakan Pompa DN-1150, Motor 562-D, Kabel 2-AL, Transformator 3 x 25 KVA dan Switchboard DPH-2 ukuran 2. Sumur R menggunakan Pompa DN-460, Motor 562-D, Kabel 2-AL, Transformator 3 x 25 KVA dan Switchboard DPH-2 ukuran 3. Sumur A menggunakan Pompa DN- 1150, Motor 562-D, Kabel 1-AL, Transformator 3 x 25 KVA dan Switchboard DPH-2 ukuran 3. Tujuan pemasangan Electric Submersible Pump (ESP) ini agar laju produksi pada Sumur M, R dan A dapat meningkat.

D DKSS field is one of the oil and gas field which is managed by PT Pertamina EP Asset 3. Well M, R and A are located on the DKSS field and all wells are still natural flow. DKSS Field will be Considerate to install Electric Submersible Pump (ESP) in that wells. With a record flow rate used was 80% of the maximum flow rate (Qmax) and water cut is considered permanent. Three wells that were examined in this DKSS field has a water cut fairly large (above 50%). In this regard, the depiction of IPR curve will use the composite method. After that, calculate the value of free gas at the pump to get total volume in the pump to determine the type of pump. M Well using DN-1150 Pump, 562-D Motor, 2-AL Cables, Transformers 3 x 25 KVA and Switchboard DPH- 2 size 2. R Well using DN-460 Pump, 562-D Motor, 2-AL Cables , Transformers 3 x 25 KVA and Switchboard DPH- 2 size 3. A Well using DN-1150 Pump, 562-D Motor, 1-AL Cables, Transformers 3 x 25 KVA and Switchboard DPH- 2 size 3. The purpose of the installation of Electric Submersible Pump ( ESP ) is that the rate of production on wells M , R and A can be increased.

Bagaimana Anda menilai Koleksi ini ?