DETAIL KOLEKSI

Evaluasi kinerja rangkaian pompa untuk rancangan sistem penyaliran tambang di PIT Nort Osela, Site Bakan, PT J Resources Bolaang Mongondow, Provinsi Sulawesi Utara


Oleh : Jeremi Rudyanto Pandiangan

Info Katalog

Nomor Panggil : 622/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Reza Aryanto

Pembimbing 2 : Irfan Marwanja

Subyek : Pump - Mining

Kata Kunci : pumps, drying, sump, open drains.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001400120_Halaman-judul.pdf 17
2. 2019_TA_TB_073001400120_Bab-1.pdf 6
3. 2019_TA_TB_073001400120_Bab-2.pdf 21
4. 2019_TA_TB_073001400120_Bab-3.pdf 11
5. 2019_TA_TB_073001400120_Bab-4.pdf 27
6. 2019_TA_TB_073001400120_Bab-5.pdf
7. 2019_TA_TB_073001400120_Daftar-pustaka.pdf 1
8. 2019_TA_TB_073001400120_Lampiran.pdf 118

S Salah satu Pit yang berada pada PT J Resources Bolaang Mongondow yaitu Pit North Osela, mulai ditambang sejak tahun 2014. Dikarenakan pengolahan orepada Pit North Osela masih belum ekonomis, pada tahun 2015 prosespenambangan di Pit North Osela diberhentikan. Kemudian pada tahun 2018, PitNorth Osela mulai ditambang lagi karena telah ditemukan cara pengolahan oreyang ekonomis. Bukaan Pit yang sebelumnya ditambang sudah terendam air danharus dikeringkan. Perusahaan sudah menerapkan sistem pemompaan untukmasalah air pada Pit North Osela. Tetapi karena belum adanya evaluasi mengenaisistem yang sudah diterapkan, perusahaan belum mengetahui kinerja dari sistempemompaan tersebut yang akan digunakan untuk rancangan sistem penyalirantambang Pit North Osela sampai akhir penambangan (final pit) di akhir tahun2019.Percobaan pemompaan dilaksanakan pada tanggal 11 September 2018sampai dengan 27 September 2018. Penelitian dilakukan untuk memantau kinerjapompa aktual, kemudian dilakukan optimalisasi rangkaian pompa tersebut untukperancangan sistem penyaliran tambang Pit North Osela seperti perancanganSump dan penentuan penggunaan pompa. Setelah ditentukan rangkaian pompayang optimal, dilakukan juga pemantauan daya tampung saluran air terbuka yangmenampung air yang dipompakan dari Pit North Osela.Hasil pemantauan rangkaian pompa aktual diketahui mempunyai efisiensipompa sebesar 43% dan lama pengeringan sump selama 49 hari. Padaoptimalisasi rangkaian pompa, dipilih rangkaian pompa dengan memindahkanposisi pompa ke atas permukaan sump dengan poonton dan menggunakan pipadorong (discharge) berdiameter luar 200 mm yang dapat mengeringkan sumpdalam waktu 12 hari. Rancangan dimensi Sump mempunyai volume sebesar 16.710 𝑚3 yang ditentukan dari debit limpasan yang masuk ke Pit NorthOsela. Dan hasil pemantauan, saluran air terbuka aktual dapat menampung airyang dipompakan dari Pit North Osela setelah peng-optimalan rangkaian pompa.

O One of the pits located at PT JResources Bolaang Mongondow, the NorthOsela Pit, began to be mined since 2014. Because ore processing in the NorthOsela Pit is still not economical, in 2015 the mining process in the North OselaPit was dismissed. Then in 2018, the North Osela Pit begins to be mined againbecause it has found economical ore processing methods. Previously mined Pitopenings have been submerged in water and must be dried. The company hasimplemented a pumping system for water problems in the North Osela Pit. Butdue to the absence of an evaluation of the system that has been implemented, thecompany does not yet know the performance of the pumping system that will beused to design the North Osela Pit mine drainage system until the final pit at theend of 2019.Pumping experiments were carried out on September 11, 2018 untilSeptember 27, 2018. The study was conducted to monitor the performance of theactual pump, then the pump series was optimized to design the North Osela Pitmine drainage system such as Sump design and determination of pump usage.After determining the optimal pump circuit, monitoring of the capacity of openwater channels that hold water pumped from the North Osela Pit is also carriedout.The results of monitoring the actual pump circuit are known to have pumpefficiency of 43% and sump drying time for 49 days. In the optimization of thepump circuit, a series of pumps is chosen by moving the position of the pumpabove the surface of the sump with the ponton and using a 200 mm externaldiameter discharge pipe which can dry the sump within 12 days. The Sumpdimension design has a volume of 1 6,710 m ^ 3 which is determined from runoffdischarge entering the North Osela Pit. And the results of monitoring, the actualopen water channel can hold pumped water from the North Osela Pit afteroptimizing the pump circuit.

Bagaimana Anda menilai Koleksi ini ?