DETAIL KOLEKSI

Identifikasi risiko keterlambatan pelaksanaan normalisasi saluran drainase di Jakarta Barat

5.0


Oleh : Renato Sitorus

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Susianti Winoto

Subyek : Flood control channels - Design and construction;Drainage

Kata Kunci : delay risk, channel normalization, drainage channel, West Jakarta

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TS_051001300076_Halaman-Judul.pdf 14
2. 2019_TA_TS_051001300076_Bab-1.pdf 3
3. 2019_TA_TS_051001300076_Bab-2.pdf
4. 2019_TA_TS_051001300076_Bab-3.pdf
5. 2019_TA_TS_051001300076_Bab-4.pdf
6. 2019_TA_TS_051001300076_Bab-5.pdf
7. 2019_TA_TS_051001300076_Daftar-Pustaka.pdf 2
8. 2019_TA_TS_051001300076_Lampiran.pdf

P Pertumbuhan kota dan perkembangan industri menimbulkan dampak yang cukup besar pada siklus hidrologi sehingga berpengaruh besar terhadap drainase perkotaan. Oleh karena itu, setiap perkembangan kota harus diikuti dengan perbaikan sistem drainase, bukan hanya pada lokasi yang di kembangkan, melaikan meliputi daerah di sekitarnya juga. Oleh sebab itu, perlu dilakukan identifikasi dan penilaian risiko untuk mengurangi atau meminimalisir risiko-risiko yang ada, sehingga kerugian yang terjadi masih dalam batas-batas yang diterima. Risiko yang di tinjau adalah risiko pelaksanaan, risiko lingkungan dan kerusakan alam, risiko sumber daya, risiko keuangan, dan risiko politik dan hukum. Pengumpulan data dilakukan dengan penyebaran kuesioner penelitian kepada 3 kontraktor pelaksana proyek normalisasi saluran di Jakarta Barat dengan jumlah 60 kuesioner. Pengolahan data dilakukan dengan metode Index Mean RRI dan bantuan software SPSS Statistic v25. Hasil analisis menunjukan terdapat 1 variabel risiko signifikan tertinggi yaitu hambatan dalam pelaksanaan karena adanya jaringan utilitas yang tertanam pada dasar saluran.

U Urban growth and industrial development have a considerable impact on the hydrological cycle which makes it a large influence on the urban drainage. Therefore every city development must be followed by an improvement in the drainage system, not only in the developed location, but also in the surrounding area. Thus it is necessary to identify and assess the risk in order to reduce or minimize existed risks hence the occurred losses are still within the accepted limits. Risks which had been reviewed were the risk of implementation, the risk of environmental and natural damage, the risk of resource, the risk of financial, and the risk of political and legal. The data collection was carried out by distributing research questionnaires to three contractors of the channel normalization project implementation in West Jakarta, with 60 questionnaires. The data processing was done using the method of Index Mean RRI, and was assisted by the SPSS Statistic v25 software. The analysis results showed that there was one of the highest significant risk variables, which was the obstacle in the implementation, due to the network utility that was embedded in the bottom of the channel.

Bagaimana Anda menilai Koleksi ini ?