DETAIL KOLEKSI

Perencanaan design casing pemboran sumur gas OYG-2 lapangan CAL

5.0


Oleh : Gerald Pascal Ginting

Info Katalog

Nomor Panggil : 1239/TP/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Mulia Ginting

Pembimbing 2 : Aqlina Fattahanisa

Subyek : Oil well drilling

Kata Kunci : maximum load, grade casing, bottom-up method.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STP_071001500052_Halaman-Judul.pdf 14
2. 2020_TA_STP_071001500052_Pengesahan.pdf 1
3. 2020_TA_STP_071001500052_Bab-1_Pendahuluan.pdf 3
4. 2020_TA_STP_071001500052_Bab-2_Tinjauan-literatur.pdf 32
5. 2020_TA_STP_071001500052_Bab-3_Kerangka-konsep.pdf 4
6. 2020_TA_STP_071001500052_Bab-4_Metode.pdf 22
7. 2020_TA_STP_071001500052_Bab-5_Kesimpulan.pdf 1
8. 2020_TA_STP_071001500052_Daftar-Pustaka.pdf 1
9. 2020_TA_STP_071001500052_Lampiran.pdf 29

P Pemasangan casing merupakan salah satu kegiatan pemboran yang berfungsi untuk mencegah permasalahan-permasalahan yang ada dalam kegiatan pemboran, seperti loss circulation, kick, dan runtuhnya dinding sumur, sehingga perlu adanya design casing yang efektif dan efisien. Tugas Akhir ini berfokus mengenai perencanaan casing pada sumur offshore “OYG-2”. Perencanaan casing meliputi penentuan casing setting depth dan grade casing, data yang digunakan berasal dari sumur offset well OYG.Penentuan titik kedalaman casing / casing setting depth menggunakan metode bottom-up. Pada metode ini diperlukan beberapa data, seperti lithology formasi, tekanan formasi, berat jenis lumpur pemboran yang digunakan, dan tekanan rekah formasi yang akan di tembus pada saat melakukan pemboran dengan offset well OYG sebagai sumur referensi.Dari hasil perhitungan yang dilakukan, untuk sumur OYG-2 akan dipasang conductor, surface, intermediate, dan production casing. Titik kedalaman conductor casing adalah 215 ft- 450 ft, titik kedalaman surface casing adalah 215 ft-1100 ft, titik kedalaman intermediate casing adalah pada 215 ft–2650 ft, dan titik kedalaman production casing adalah 215 ft-3281 ft. Setelah menentukan casing setting depth dilanjutkan dengan pemilihan grade casing yang sesuai untuk menahan tekanan yang ada pada formasi dengan menggunakan metode maximum load terhadap grade casing yang digunakan pada sumur OYG-2.Perhitungan yang digunakan dalam metode maximum load adalah dengan menghitung beban burst, collapse, dan tension. Beban burst, collapse, dan tension untuk casing 20” berturut-turut sebsar 936,15 psi, 980,11 psi, dan 182595,8 lbs. Beban burst, collapse, dan tension untuk casing 13 3/8” berturut-turut sebesar 2262,67 psi, 2078,75 psi, 219954,06 lbs. Beban burst, collapse, dan tension untuk casing 9 5/8” berturut-turut sebesar 1667,65 psi, 2186,13 psi, dan 163799,54 lbs.Dengan menggunakan safety factor burst 1,1, collapse 1,1, dan tension 1,5, diperoleh grade casing yang paling efektif dan efisien untuk surface casing 20” adalah K-55;133 ppf, intermediate casing 13 3/8” adalah L-80;68 ppf, production casing 9 5/8 adalah L-80;40 ppf.

C Casing installation is one of the drilling activities that serves to prevent problems that exist in drilling activities, such as loss circulation, kicks, and collapse of the well wall, so the need for an effective and efficient casing design. This Final Project focuses on casing planning in the "OYG-2" offshore well. Casing planning includes determining the casing setting depth and grade of the casing, the data used comes from OYG offset wells.Determination of the casing depth / casing setting depth using the bottom-up method. In this method some data is needed, such as lithology of formation, formation pressure, specific gravity of drilling mud used, and fracture pressure of formation that will be broken when drilling with offset well OYG as a reference well.From the results of calculations performed, for the OYG-2 well a conductor, surface, intermediate, and production casing will be installed. The casing conductor depth is 215 ft-450 ft, the casing surface depth is 215 ft-1100 ft, the intermediate casing depth is 215 ft-2650 ft, and the casing's production depth is 215 ft-3281 ft. After determining the casing setting, the depth is continued by selecting the appropriate casing grade to withstand the pressure on the formation using the maximum load method for the casing grade used in the OYG-2 well.The calculation used in the maximum load method is to calculate burst, collapse, and tension loads. Burst, collapse, and tension for casing 20 "respectively 936.15 psi, 980.11 psi, and 182595.8 lbs. Burst, collapse, and tension for casing 13 3/8 "are 2262.67 psi, 2078.75 psi, 219954.06 lbs. Burst, collapse, and tension for 9 9/8 " casing are 1667.65 psi, 2186.13 psi, and 163799.54 lbs.By using safety factor burst 1.1, collapse 1.1, and tension 1.5, obtained the most effective and efficient casing grade for surface casing 20 "is K-55; 133 ppf, intermediate casing 13 3/8" is L -80; 68 ppf, production casing 9 5/8 is L-80; 40 ppf.

Bagaimana Anda menilai Koleksi ini ?