DETAIL KOLEKSI

Analisis kelayakan ekonomi rencana pertambangan tembaga di kabupaten Nagan Raya studi kasus PT X

1.0


Oleh : Akbar Heryan Prananda

Info Katalog

Nomor Panggil : 670/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Mixsindo K. H.

Subyek : Copper mines and mining - Economic aspects

Kata Kunci : economic feasibility analysis, copper mining, Nagan Raya district

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_07312016_Halaman-Judul.pdf 15
2. 2019_TA_TB_07312016_Bab-1.pdf 3
3. 2019_TA_TB_07312016_Bab-2.pdf 14
4. 2019_TA_TB_07312016_Bab-3.pdf 4
5. 2019_TA_TB_07312016_Bab-4.pdf 18
6. 2019_TA_TB_07312016_Bab-5.pdf 1
7. 2019_TA_TB_07312016_Daftar-Pustaka.pdf 1
8. 2019_TA_TB_07312016_Lampiran.pdf 12

P PT X adalah salah satu perusahaan di bidang penambangan emas yang sedang melakukan rencana penambangan emas di Kabupaten Nagan Raya, Provinsi Aceh. Rencana penambangan yang akan dilakukan sesuai dengan umur tambang yaitu 11 tahun. Berdasarkan kebutuhan modal yang besar serta resiko yang tinggi, maka sebelum kegiatan penambangan perlu dilakukan kajian ekonomi terlebih dahulu untuk dapat mengetahui tingkat pengembalian dan keuntungan dari investasi yang dilakukan.Berdasarkan data yang akan didapat oleh penulis dari PT X berupa estimasi cadangan, biaya investasi, target produksi dan biaya-biaya investasi. Dan dengan menghitung menggunakan metode Net Present Value dan Internal Rate of Return dan payback Period penulis akan mengetahui apakah rencana kegiatan pertambangan layak secara ekonomi atau tidak. Dari hasil penelitian ini didapatkan nilai Net Present Value di discount rate10% sebesar 161,592,392 US$ dan nilai Internal Rate Of Return sebesar 21.01% yang menyatakan bahwa proyek ini layak secara ekonomis dengan kriteria Netpresent Value dan Intertal Rate Of Return yang diminta oleh perusahaan minimum atau sama dengan 20%. dengan tingkat produksi tembaga 271.519 Ton ,Emas 140.387 Oz dan perak 1.657.736 Oz.Dari hasil analisa sensifitas didapatkan bahwa variabel komoditas paling berpengaruh terhadap perubahan NPV dan IRR terutama pada perubahan harga komoditas tembaga. Maka dari itu perlu dilakukan perhatian khusus terhadap perubahan harga komoditas selama umur tambang agar kelayakan investasi dapat terjaga.

P PT X is one of the companies in the field of gold mining that is conducting a gold mining plan in Nagan Raya Regency, Aceh Province. The mining plan that will be carried out in accordance with the age of the mine is 11 years. Based on the large capital requirements and high risks, prior to mining activities an economic study needs to be done first to be able to find out the rate of return and the benefits of the investment made. Based on the data to be obtained by the author from PT X in the form of estimated reserves, investment costs, targets production and investment costs. And by calculating using the Net Present Value method and the Internal Rate of Return and Payback Period the author will find out whether the planned mining activities are economically feasible or not. From the results of this study, the net present value is obtained at a discount rate of 10% of 161,592,392 US $ and an Internal Rate of Return value of 21.01% which states that this project is economically feasible with Netpresent Value and Intertal Rate of Return criteria requested by the minimum or the same company by 20%. with copper production levels of 271,519 Tons, Gold of 140,387 Oz and silver of 1,657,736 Oz. From the results of sensitivity analysis it is found that commodity variables most influential on changes in NPV and IRR especially in changes in copper commodity prices. Therefore special attention needs to be paid to changes in commodity prices over the life of the mine so that investment viability can be maintained.

Bagaimana Anda menilai Koleksi ini ?