Reducing hydrocarbon in place uncertainty in Akasia Bagus Structureas potential field and redevelopment review
Subyek : Hydrocarbon reservoirs
Penerbit : FTKE - Usakti
Kota Terbit : Jakarta
Tahun Terbit : 2019
Pembimbing 1 : Sugiatmo Kasmungin
Pembimbing 2 : Suryo Prakoso
Kata Kunci : OOIP, OGIP, production analysism L Layer of Akasia Bagus Structure, economic.
Status Posting : Published
Status : Lengkap
| No. | Nama File | Hal. | Link |
|---|---|---|---|
| 1. | 2019_TS_MTP_171141016_Halaman-Judul.pdf | 19 | |
| 2. | 2019_TS_MTP_171141016_Lembar-Pengesahan.pdf | 4 | |
| 3. | 2019_TS_MTP_171141016_Bab-1_Pendahuluan.pdf | 3 | |
| 4. | 2019_TS_MTP_171141016_Bab-2_Tinjauan-Pustaka.pdf |
|
|
| 5. | 2019_TS_MTP_171141016_Bab-3_Metodologi.pdf |
|
|
| 6. | 2019_TS_MTP_171141016_Bab-4_Hasil-dan-Analisis-Data.pdf |
|
|
| 7. | 2019_TS_MTP_171141016_Bab-5_Kesimpulan-dan-Saran.pdf | 1 | |
| 8. | 2019_TS_MTP_171141016_Daftar-pustaka.pdf | 1 | |
| 9. | 2019_TS_MTP_171141016_Lampiran.pdf |
|
K Keberhasilan penemuan struktur baru Akasia Bagus dengan lapisan potensial L pada tahun 2009 di Lapangan Jatibarang PT Pertamina EP ditindaklanjuti dengan pemboran sumur-sumur infill dengan mekanisme POD yang sampai sekarang sedang dalam proses pemboran sumur terakhir. Dasar dari perhitungan hydrocarcon in place Lapisan L pada POD adalah analisa static. Sumur-sumur yang sekarang diproduksikan masih mampu mengalir dengan natural flow dan sudah cukup data produksi sejak tahun 2009 struktur ini ditemukan. Penelitian ini akan menyajikan analisa produksi pada lapisan L struktur Akasia Bagus untuk update OOIP dengan menggunakan metode material balance konvensional kemudian melakukan strategi pengembangan terbaik untuk mengoptimalkan produksi minyak. Analisis ekonomi juga dilakukan untuk acuan dalam membuat keputusan skenario mana yang akan dipilih. Metode material balance konvensional mendapatkan nila OOIP 17,36 MMSTB, dengan rasio energy pendorong nya adalah 5:3:2 untuk water influx : fluid expansion : gas cap expansion. Tiga (3) skenario optimasi produksi telah dianalisis, hasilnya menunjukkan bahwa penambahan 2 sumur infill mencapai RF oil hingga 23%, produksi air minimal dan hasil ekonomi yang menarik.
T The success of discovery of new structure Akasia Bagus with potential L layerin 2009 at PT Pertamina EP's Jatibarang Field was followed up by the drilling infillwells with Plan of Development (POD) mechanism which is currently in the processof drilling the last well. The basis of the L layer hydrocarbon calculation in place onthe Plan of Development (POD) is a static analysis. The wells currently produced arestill able to flow with natural flow and enough production data since 2009 thisstructure was found. This study will present an analysis of production in the L layerof Akasia Bagus structure for OOIP updates using the conventional material balancemethod and then carry out the best development strategy to optimize oil production.Economic analysis is also carried out for reference in making decision on whichscenario to choose. The conventional material balance method gets an OOIP value of17.36 MMSTB, with the drive energy ratio being 5:3:2 for water influx : fluidexpansion : gas cap expansion. Three (3) production optimization scenarios wereanalyzed, the results showed that the addition of 2 infill wells reached RF oil up to23%, minimal water production and attractive economic results.