DETAIL KOLEKSI

Studi rencana reklamasi pada PIT 4 di PT Dizamatra Powerindo, Lahat Sumatera Selatan

0.0


Oleh : Fredinand Debbyanus Bolang

Info Katalog

Nomor Panggil : 752/TT/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Reza Aryanto, S.T., M.T.

Pembimbing 2 : Ririn Yulianti, S.T., M.T.

Subyek : Reclamation of land;Mining engineering

Kata Kunci : Reclamation, Land Arrangement, Revegetation, Reclamation Costs

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STT_073.15.046_Halaman-judul.pdf
2. 2020_TA_STT_073.15.046_Lembar-pengesahan.pdf
3. 2020_TA_STT_073.15.046_Bab-1_Pendahulan.pdf 3
4. 2020_TA_STT_073.15.046_Bab-2_Tinjauan-pustaka.pdf 21
5. 2020_TA_STT_073.15.046_Bab-3_Kerangka-konsep.pdf 4
6. 2020_TA_STT_073.15.046_Bab-4_Metode.pdf 38
7. 2020_TA_STT_073.15.046_Bab-5_Kesimpulan.pdf
8. 2020_TA_STT_073.15.046_Daftar-pustaka.pdf
9. 2020_TA_STT_073.15.046_Lampiran.pdf 30

P PT. dizamatra powerindo merupakan perusahaan yang bergerak dalam usaha pertambangan batubara. Dalam melakukan kegiatan pertambangan PT. dizamatra powerindo berkomitmen untuk melakukan kegiatan reklamasi sejak tahun 2009.Agar kegiatan reklamasi tersebut dapat berjalan dengan lancar, perlu dilakukan perencanaan terlebih dahulu sebelum melakukan kegiatan reklamasi serta melakukan perhitungan biaya sehingga mengetahui besar biaya yang akan dikeluarkan dalam melakukan reklamasi di pit 4 nantinya. Berdasarkan padaperaturan menteri kehutanan No 4 tahun 2011. Rencana reklamasi dibedakanmenjadi 2 tahap utama yaitu penataan lahan, dan revegetasi Peneliti melakukanperencanaan reklamasi pada pit 4 dengan luasan 14 ha serta melakukanperhitungan biaya langsung dari rencana reklamasi. Dalam rencana penataan dilakukan pengaturan bentuk lahan, penggalian dan pengangkutan tanah pucuk,penyebaran tanah pucuk serta pengendalian erosi dengan membuat drainase danteras guludan. Dalam rencana revegetasi dilakukan analisa kualitas tanah,pemilihan jenis tanaman cover crop yaitu colopogonium mucunoides, tanamanpionir yaitu jabon dan sengon laut dan untuk tanaman lokal yaitu karet dan kayuputih, pembuatan pola penanaman cover crop 50×50 cm², pionir 4×4 m², danlokal 8×8 m², perhitungan pengadaan bibit pionir sebanyak 9625 pohon, bibittanaman lokal sebanyak 2.406 pohon dan pengadaan pupuk kompos sebanyak22.435 kg dan NPK sebanyak 3.434 kg, dan pemeliharaan dilakukan 4 tahapkegiatan yaitu pemupukan, pengendalian hama, penyulaman.serta melakukanpenyiangan Biaya estimasi dalam rencana penataan lahan sebesar Rp49.461.424/ha, biaya rencana revegetasi sebesar Rp 10.680.446 /ha, biaya rencanapemeliharaan sebesar Rp 22.303.125/ha.Total biaya yaitu Rp 82.444.995/ha

P PT. dizamatra powerindo is a company engaged in the coal mining business. Indoing mining activities PT. Dizamatra Powerindo is committed to conductingreclamation activities since 2009. In the order for reclamation activities to worksmoothly, it is needed to do a plan before reclaiming and so knowing the amountof the costs that will be incurred in the conducting reclamation in pit 4 later.Based on the Minister of Forestry Regulation No. 4 of 2011. Reclamation plansare divided into 3 main stages, that is planning of land, revegetation, andmaintenance. Researchers conducted reclamation planning in pit 4 with an areaof 14 ha and calculated the direct costs of the reclamation plan. In the structuringplan, landform arrangements is done, excavation and transportation of the topsoil, top soil distribution and erosion control by making a drainage and terracedterraces. In the revegetation plan, soil quality analysis is done, the selection of thecover crop types are colopogonium mucunoides, pioneer plants that is jabon andsengon laut and for local plants that is rubber and eucalyptus, making a plantingpatterns of cover crop 50 × 50 cm², pioneering 4 × 4 m², and local 8 × 8 m²,calculation of 9625 trees for pioneer seedlings, 2,406 trees for local plants and22,435 kg for compost and NPK for 3,434 kg. In the maintenance plan, threephases of activities are done, that is fertilizing, pest control and replanting.Estimated cost of land planning are Rp. 49,461,424 /ha, revegetation plan costsRp. 10.680.446 /ha, maintenance plan costs Rp. 22.303.125/ha. Total costs areRp. 82,444,995 /ha

Bagaimana Anda menilai Koleksi ini ?