DETAIL KOLEKSI

Perencanaan pengembangan jaringan pipa induk air minum di Kota Serang sampai dengan tahun 2040

0.0


Oleh : Nadia Khoirunnisa

Info Katalog

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Winarni

Pembimbing 2 : Lailatus Siami

Subyek : Enviromental management - Drinking water supply

Kata Kunci : Serang City, design, main pipe, dringking water supply.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_STL_082001500039_Halaman-Judul.pdf
2. 2019_TA_STL_082001500039_Bab-1.pdf
3. 2019_TA_STL_082001500039_Bab-2.pdf 29
4. 2019_TA_STL_082001500039_Bab-3.pdf
5. 2019_TA_STL_082001500039_Bab-4.pdf
6. 2019_TA_STL_082001500039_Bab-5.pdf
7. 2019_TA_STL_082001500039_Bab-6.pdf
8. 2019_TA_STL_082001500039_Bab-7.pdf
9. 2019_TA_STL_082001500039_Bab-8.pdf
10. 2019_TA_STL_082001500039_Daftar-Pustaka.pdf
11. 2019_TA_TL_082001500039_Lampiran.pdf 147

P Pada tahun 2018, jumlah penduduk Kota Serang adalah sebanyak 677.804 jiwa dengan persentase cakupan pelayanan air minum sebesar 3,28%. Perencanaan pengembangan sistem penyediaan air minum direncanakan melayani hingga 90% dari total penduduk Kota Serang, sehingga penduduk yang akan terlayani adalah sebanyak 943.305 jiwa pada tahun 2040. Kapasitas rencana yang akan dibutuhkan sampai tahun 2040 adalah 2.506,56 L/detik. Alternatif mempertimbangkan kondisi topografi Kota Serang. Titik tertinggi reservoir rencana yaitu 130 m menuju titik terendah daerah pelayanan yaitu 2 m sehingga tidak memungkinkan sistem dijadikan 1 loop. Alternatif 1 direncanakan menggunakan 3 sistem jaringan terpisah (loop) dengan penambahan 3 reservoir baru yaitu 1 reservoir di pusat kota dengan sistem pemompaan dan 2 reservoir dengan sistem gravitasi yang mempertimbangkan head statis yaitu tidak lebih dari 80 m. Alternatif 2 direncanakan menggunakan 2 sistem terpisah dengan penambahan 2 reservoir baru yang menggunakan sistem gravitasi serta mempertimbangkan keadaan head statisnya. Alternatif terpilih adalah alternatif 1 karena biaya per tahun yang lebih murah dibandingkan dengan alternatif 2. Total panjang pipa induk distribusi sepanjang 139.920 m dengan diameter sebesar 200 mm – 1200 mm, panjang pipa transmisi air minum sepanjang 22.200 m, transmisi air baku sepanjang 10.140 m. Pompa yang digunakan sebanyak 14 unit dengan head 20-60 m pada pipa distribusi dan 5 unit dengan head 20-40 pada pompa transmisi. Sistem akan melayani penduduk sebanyak207.341 sambungan rumah. Total anggaran biaya perencanaan pengembangan SPAM sebesar Rp 3.858.800/m panjang pipa induk dan Rp 1.924.931/SR. Biaya investasi Tahap I sebesar Rp 230.502.471.765; Tahap II sebesar Rp99.302.820.679; dan Tahap III sebesar Rp69.324.508.907.

I In 2018, the total of population in Serang City is 677.804 people with percentage of drinking water services is 3,28%. The plan to develop drinking water supply system is planned to serve up to 90% of total population of Serang City, so that the population will be served is943,305 people in 2040. Plan capacity will be needed untul 2040 is 2,506.56 L/second. Alternatives consider the topographic condition of Serang City. The highest point of planned reservoir is 130 meters to the lowest point of the service area which is 2 , so it is impossible to become 1 loop. Alternative 1 is planned to use 3 separate network systems (loops) with the addition of 3 new reservoirs, 1 reservoir in the center of the city with pump system and 2 reservoirs with a gravity system that considers a head ststic that is no more than 80 meters. Alternative 2 is planned to use 2 separate systems by adding 2 new reservoirs using the gravity system and considering the head static. Seletcted alternative is alternative 1 because the cost per year is cheaper than alternative 2. The total length of distribution main pipes are139.920 m with a diameter of 200 mm - 1200 mm, the length of the drinking water transmission pipe is 22.200 m, the raw water transmission is 10.140 m. System use 14 pump units with heads 20-60 m in the distribution pipe and 5 pump units with heads 20-40 in the transmission pump. The system will serve a population of 207.341 house connections. The total budget for the distribution system development plan is Rp 3.858.800/meters of the main pipe, and Rp 1.924.931/house connection. Phase I investment costs smount to Rp 230.502.471.765; Phase II amounting to Rp 99.302.820.679; and Phase III amounting to Rp 69.324.508.907.

Bagaimana Anda menilai Koleksi ini ?