DETAIL KOLEKSI

Prediksi potensi sumur dengan metode water oil ratio pada lapangan PHN

1.0


Oleh : Dorothea Dyah Puspita

Info Katalog

Nomor Panggil : 911/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Onnie Ridaliani

Pembimbing 2 : Listiana Satiawati

Subyek : Oil and gas;Water oil ratio

Kata Kunci : water oil ratio, chan’s diagnostic plot, water channeling, estimated ultimate recovery

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_071001400049_Halaman-Judul.pdf
2. 2018_TA_TM_071001400049_Bab-1.pdf
3. 2018_TA_TM_071001400049_Bab-2.pdf
4. 2018_TA_TM_071001400049_Bab-3.pdf
5. 2018_TA_TM_071001400049_Bab-4.pdf
6. 2018_TA_TM_071001400049_Bab-5.pdf
7. 2018_TA_TM_071001400049_Daftar-Pustaka.pdf
8. 2018_TA_TM_071001400049_Lampiran.pdf

P Pada pengelolaan lapangan migas, diperlukan peramalan produksi untuk mengetahui langkah-langkah yang akan diambil dikemudian hari. Oleh karena itu,pada penelitian ini dilakukan prediksi potensi sumur dengan Metode water oil ratio.Prediksi potensi sumur yang dimaksud pada penelitian kali ini yaitu untukmemprediksi nilai estimated ultimate recovery (EUR) atau kumulatif produksi minyak dimasa mendatang. Lapangan PHN memiliki permasalahan sumur berupa produksi air yang berlebih dan setelah dianalisa menggunakan Chan’s Diagnostic Plot, didapatkanhasil bahwa sumur di Lapangan PHN mengalami water channeling. Jenis dari water channeling tersebut yaitu pada Sumur PHN-1, PHN-2, dan PHN-5 mengalami nearwellbore channeling, lalu Sumur PHN-4 mengalami normal displacement dengan WOR tinggi dan Sumur PHN-3 mengalami rapid channeling Setelah mengetahui jenis permasalahan air tersebut, dilakukan prediksi potensi sumur (kumulatif produksi maksimum) baik sumur mengalami water channeling maupun sumur yangnormal atau tidak mengalami permasalahan. Prediksi potensi sumur yang berupa nilai kumulatif produksi maksimum atau Estimated Ultimate Recovery (EUR) didapatkan dengan Metode water oil ratio.Metode ini yaitu menggunakan lima plot-plot diantaranya water cut, fraksi minyak,kumulatif WOR, kumulatif watercut, dan terakhir yaitu1𝑓𝑤yang dibandingkanmasing-masing dengan kumulatif produksi maksimum. Lalu setelah diketahui nilaiEUR dari masing-masing sumur baik itu mengalami permasalahan air maupunnormal, didapatkan kehilangan prediksi kumulatif produksi masing-masing sumur.Kehilangan EUR terbesar terlihat dari Sumur PHN-2 dengan total kehilangan4860,982 STB. Sumur PHN-1, PHN-3, PHN-4, dan PHN-5 total kehilangan kumulatif produksi maksimum secara berturut-turut yaitu 551,267 STB; 2522,196STB; 999,051 STB; 12,536 STB.

I In the management of oil and gas fields, production forecasting is needed to find out the steps to be taken in the future. Therefore, in this study the prediction of the potential of wells with the water oil method is predicted. Predicting the potential of the well referred to in this study is to predict the estimated ultimate recovery value (EUR) or cumulative oil production in the future. The PHN field has a well problem in the form of excess water production and after being analyzed using Chan’s Diagnostic Plot, it was found that the well at PHN Field experienced water channeling. The types of water channeling are PHN-1, PHN-2, and PHN-5 wells having nearwellbore channeling, then PHN-4 wells experience normal displacement with high WOR and PHN-3 wells experiencing rapid channeling After knowing the type of water problem, predictions of the potential of wells (cumulative maximum production) both wells experience normal water channeling and wells or no problems. Prediction of well potential in the form of cumulative maximum production value or Estimated Ultimate Recovery (EUR) is obtained by the water oil ratio method. This method uses five plots including water cut, oil fraction, cumulative WOR, cumulative watercut, and lastly 1) compared to each with maximum cumulative production. Then after it was discovered that the EUR value of each well experienced both water and abnormal problems, it was found to lose the cumulative prediction of the production of each well. The largest EUR loss was seen from PHN-2 Well with a total loss of 4860,982 STB. PHN-1, PHN-3, PHN-4, and PHN-5 wells with total cumulative losses of maximum production, respectively 551,267 STB; 2522,196STB; 999,051 STB; 12,536 STB.

Bagaimana Anda menilai Koleksi ini ?