DETAIL KOLEKSI

Evaluasi dan penggunaan high performance water based mud trayek 12 1/4" dan 8 1/2" pada sumur AR-11

3.5


Oleh : Annisa Rachmadani

Info Katalog

Nomor Panggil : 875/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : -

Subyek : Drilling mud - Oil technic;High performance water based mud

Kata Kunci : drilling fluid, mud, kcl polymer

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_071001400021_Halaman-Judul.pdf 15
2. 2018_TA_TM_071001400021_BAB-1.pdf 3
3. 2018_TA_TM_071001400021_BAB-2.pdf 10
4. 2018_TA_TM_071001400021_BAB-3.pdf 3
5. 2018_TA_TM_071001400021_BAB-4.pdf
6. 2018_TA_TM_071001400021_BAB-5.pdf
7. 2018_TA_TM_071001400021_Daftar-Pustaka.pdf 2
8. 2018_TA_TM_071001400021_Lampiran.pdf

D Dalam proses pemboran agar tetap berlangsung merupakan fungsi dari fluidapemboran, fluida tersebut sudah telah didesain sebagai peran pembantu. Komposisidan sifat fisika dan fluida atau lumpur sangat berpengaruh dalam proses pemboran,karena salah satu faktor yang mempengaruhhi kesuksesan pemboran adalah formasiyang ditembus dan lumpur yang digunakan. Fluida pemboran sangat dibutuhkandan mempengaruhi efisiensi, kecepatan pemboran, keselamatan, dan cost.Untuk menentukan sistem atau desain program lumpur yang akan digunakanpada sumur AR-11 yaitu dengan menggunakan sistem korelasi lumpur. Sumur yangdigunakan sebagai offset well atau evaluasi adalah sumur AR-10. Sistem lumpuryang sering digunakan dilapangan A yaitu KCL Polimer dan HPWBM, karenalumpur tersebut cocok untuk mengatasi masalah yang terjadi sesama prosespemboran.High Performance Water Based Mud adalah lumpur yang berbahan dasar airyang memiliki kelebihan juga ramah lingkungan. High Performance Water BasedMud menggunakan penghambat shale untuk mencegah shale problem selamaoperasi pemboran berlangsung. Skripsi ini bertujuan untuk mengevaluasipermasalahan yang terjadi pada sumur AR-10 yaitu sloughing shale dan swellingclay.

T The drilling fluid is a fluid that designed to help the drilling process.Compositiion and physical properties of the mud is very influently on a drillingoperation, because one of the factors that determine success or failure of a drillingmud is dependent on the drill being used. Drilling speed, efficiency, safety, and costof drilling depends on the drilling is absolutely necessary in the process.To determine the mud system used in AR-11 wells are using the correlationmethod mud system. Wells are to be offset well or well for the prospects of keyexploration well is AR-10 well. Mud system which is often used in the field are KCLPolymer and High performance Water Base Mud, because it is suitable to solve theproblems during the drilling takes places.High Performance Water Base Mud is a water base mud system which notonly have some specific ability but also environmental friendly. This HPWBMsystem use organic shale inhibitor to prevent the shale problem during drillingoperation. This final project aims to find out how clay swelling happens and howthe shale inhibitor prevent the shale problem. This final assignment is made for anevalution of a well stability problems which is sloughing shale and swelling clay onwell AR-11.

Bagaimana Anda menilai Koleksi ini ?