Estimasi biaya produksi terhadap target produksi satu juta ton bijih bauksit tercuci di unit bisnis pertambangan bauksit PT. Antam (persero), Tbk. Tayan, Sanggau, Kalbar

3.0


Oleh : Boby Priadi

Info Katalog

Nomor Panggil : 459/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Hermanto S.

Pembimbing 2 : Bani Nugroho

Subyek : Bauxite;Production cost

Kata Kunci : productivity, working hours, owning cost, operation cost and total production cost

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TB_073001300018_Halaman-judul.pdf
2. 2018_TA_TB_073001300018_Bab-1.pdf
3. 2018_TA_TB_073001300018_Bab-2.pdf
4. 2018_TA_TB_073001300018_Bab-3.pdf
5. 2018_TA_TB_073001300018_Bab-4.pdf
6. 2018_TA_TB_073001300018_Bab-5.pdf
7. 2018_TA_TB_073001300018_Bab-6.pdf
8. 2018_TA_TB_073001300018_Bab-7.pdf
9. 2018_TA_TB_073001300018_Daptar-pustaka.pdf
10. 2018_TA_TB_073001300018_Lampiran.pdf

P Pada tahun 2018 UBPB PT ANTAM (Persero) Tbk menargetkan produksisebesar 1.000.000 ton per tahun untuk bijih bauksit tercuci (washed bauxit),sehingga perlunya estimasi mengenai besarnya biaya yang dibutuhkan terhadaptarget produksi tersebut. Untuk menentukan biaya suatu penambangan, diperlukanperencanaan jumlah alat yang sesuai dengan tingkat kebutuhan, denganmenentukan jumlah alat yang sesuai, sehingga perusahaan dapat menekan biayaproduksi.Metode penelitian yang digunakan adalah penelitian deskriptif denganpendekatan analisis kuantitatif yaitu perhitungan biaya produksi untukperencanaan penambangan bijih bauksit tercuciBerdasarkan analisis data pada penelitian ini, yang mempengaruhi biayaproduksi adalah produktivitas, jam kerja alat, owning cost, operation cost alatmuat dan alat angkut, bulldozer serta alat support yang direncanakan untukberoperasi, sehingga diperoleh total biaya produksi sebesar $ 4.451.721,42 denganbiaya per ton sebesar $ 4,45.

I In 2018, UBPB PT ANTAM (Persero) Tbk sets production target of1,000,000 tons per year for washed bauxite, so the need for estimating the amountof cost is required for the production target. To determine the cost of miningoperation, required planning the number of heavy equipments in accordance withthe level of need. By determining the number of appropriate heavy equipments, sothat companies can reduce production costs.This research uses descriptive research method with quantitative analysisapproachment in the form of calculation of production cost for planning ofwashed bauxite ore mining operation.Based on data analysis in this research, production cost is influenced byproductivity, working hours, owning cost, operation cost of loading and haulingequipments, bulldozers and supporting equipments that are planned to beoperated, obtained the total production cost is $ 4,451,721,42 with cost per ton of$ 4.45.