DETAIL KOLEKSI

Perencanaan sistem instalasi pipa distribusi air bersih, instalasi pipa air kotor, instalasi pipa air buangan dan instalasi pipa vent di Apartemen Arandra Residence, Jakarta


Oleh : Herikson Manumpak

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Husein Abdul Aziz

Subyek : Pipe - Quality control;Pipeline

Kata Kunci : plumbing, clean water, dirty water, waste water, vent, volume.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_STM_06112001_Halaman-Judul.pdf
2. 2019_TA_STM_06112001_Lembar-Pengesahan.pdf
3. 2019_TA_STM_06112001_Bab-1_Pendahuluan.pdf
4. 2019_TA_STM_06112001_Bab-2_Tinjauan-Pustaka.pdf
5. 2019_TA_STM_06112001_Bab-3_Metodologi-Perencanaan.pdf
6. 2019_TA_STM_06112001_Bab-4_-Hasil-dan-Pembahasan.pdf
7. 2019_TA_STM_06112001_Bab-5_Kesimpulan.pdf
8. 2019_TA_STM_06112001_Daftar-Pustaka.pdf
9. 2019_TA_STM_06112001_Lampiran.pdf

S Sistem plambing adalah bagian yang sangat penting dalam bangunan gedung bertingkat tinggi. Dimana sistem plambing meliputi sistem instalasi pipa distribusi air bersih, sistem instalasi pipa air kotor, sistem instalasi pipa air buangan dan jugs sistem instalasi pipa vent. Dalam hal ini, bangunan bertingkat yang dimaksud adalah bangunan minimal empat lantai yaitu hotel, apartemen, perkantoran dan pusat perbelanjaan (mall). Ketersediaan air bersih sangat menunjang pengguna gedung. Dalam perencanaan Sistem plumbing hams sesuai dengan standar pedoman plumbing Indonesia. Apartemen Arandra Residences Jakarta adalah salah satu bangunan bertingkat tinggi yang sedang dalam pelaksanaan kontraksi. Apartemen Arandra Residence dengan tinggi bangunan 24 lantai dengan luas per lantai 1.081,3 m2, memiliki jumlah penghuni 1557 orang, membutuhkan air bersih sebesar 374 m3/hari. Untuk pemdistribusian air yamg maksimal, dilakukan perhitungan diameter pipa dari peralatan plumbing yang terpasang dengan laju Aliran air yaitu 2 m/s. Maka perhitungan kapasitas volume Ground Water Reservoir (GWR) dibutuhkan adalah 236 m3 dan Volume Rooftank yang dibutuhkan adalah 35 m3- Sedangkan kapasitas pompa utama yang digunakan untuk mengalirkan air bersih dari Ground Water Reservoar (GWR) ke Rooftank adalah 1,25 m3/menit. Dari perihitungan tersebut dapat diketahui nilai proyek instalasi pipa air bersih, instalasi pipa air kotor, instalasi pipa air buangan dan instalasi pipa vent adalah Rp 3.922.717.613.

T The plumbing system is a very important part of high-rise buildings. Where the plumbing system includes a clean air distribution pipe installation system, dirty water pipe installation system, sewage pipe installation system and vent pipe installation system. In this case, the multi-storey building is called a four-storey building, namely hotels, apartments, offices and shopping centers (malls). The availability of clean water greatly supports building users. In planning the plumbing system must be in accordance with "Pedorna.n Plumbing Indonesia". Apartment Arandra Residences Jakarta is one of the high-rise buildings that are under construction. Arandra Residence Apartment with a height of 24 floors with an area of 1081,3 m2 per floor, has a total of 1557 people, requires clean air of 374 m3 / day. For maximum distribution of clean water, a pipe diameter calculation from the plumbing equipment is installed with a water flow rate of 2 m /s. Then the volume capacity of the Water Reservoir Ground (GWR) required is 236 m3 and Rooftank Volume required is 35 m3. While the main pump capacity used to drain clean water from the Water Reservoir (GWR) to Rooftank is 1,25 m3 / minute. Clean air distribution system starting from the 20th floor to the 1st floor by going ,from the 24rd floor to the 22st floor using the help of a booster pump. Then from the data obtained the value of the project of clean water pipe installation, sewage pipe installation, sewage pipe installation and vent pipe installation is Rp 3.922.717.613.

Bagaimana Anda menilai Koleksi ini ?