Perancangan instalasi penerangan dan ac pada Hotel Neo Pontianak Kalimantan Barat


Oleh : Nanda Putra Pratama

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Ishak Kasim

Subyek : Energy conservation;Electrical engineering

Kata Kunci : electrical power, planning, hotel electrical installation

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_STE_062001400012_Halaman-Judul.pdf
2. 2018_TA_STE_062001400012_Lembaran-Pengesahan.pdf
3. 2018_TA_STE_062001400012_Bab-1_Pendahuluan.pdf
4. 2018_TA_STE_062001400012_Bab-2_Landasan-Teori.pdf
5. 2018_TA_STE_062001400012_Bab-3_Perencanaan-Instalasi-Listrik.pdf
6. 2018_TA_STE_062001400012_Bab-4_Analisa-dan-Perhitungan.pdf
7. 2018_TA_STE_062001400012_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2018_TA_STE_062001400012_Daftar-Pustaka.pdf
9. 2018_TA_STE_062001400012_Lampiran.pdf

A Adanya peluang ekonomi di Kota Pontianak Kalimantan Barat dimana pembangunan di kota tersebut bisa di katakan sangat pesat karena dapat dilihat dari grafik lapangan usaha yang dimana sektor peninapan penunjang ekonomi terbesar kota ini maka akan di bangun Hotel Neo sebagai fasilitas penginapan yang mempuni, bangunin ini terdiri dari 13 lantai dan di bangun di atas tanah seluas ±461,160 in2 dengan tinggi bangunan 42 meter. Melihat dari luas dan fungsi dari bangunan tersebut maka di butuhkan suatu sistem instalasi listrik yang mempuni, aman, nyaman dan sesuai dengan persyaratan seperti PULL SNI agar orang yang ada di dalam bangunan tersebut merasa aman dan nyaman claim menikmati hotel tsb, dalam hal instalasi listrik perkiraan total beban atau daya yang akan digunakan sekitar 875.613 Watt hal tersebut meliputi beban lampu, AC, fan, lift, pompa, dan elektrikal arus lemah dimana total beban itu di bagi pada tiap power panel per lantai sampai per kamar, lalu pembagian terse* _ ulai dari panel utama tegangan rendah dei atau bisa di sebut low voltage lit tribution panel, dimana panel ini akan mernbagi lagi ke panel sub distribution di beberapa lantai saja dan setelah itu barulah di bagi ke masing masing lantai ataupun masing masing beban seperti beban yang besar yaitu lift dan pompa. Dilihat dari total beban tersebut maka dibutuhkan daya sebesar 1250 KVA dari PLN dengan penghantar kabel NYY 6(4x 1 cx240)mm2 + BC 120 mm2 lalu seluruh hasil perhitungan luas penghantar kabel dapat di lihat pada halaman 78 dan seluruh hasil mengenai drop tegangan dapat dilihat pada halaman 108. •Untuk menunjang kenyamanan dan kehandalan dari hotel ini di siapkan supply daya selain dari PLN yaitu Generator Set sebesar 1200 KVA di tambah sistem ATS AMF agar pada saat supply daya dari PLN redup akan langsung di hidupkan secara automatic oleh sistem tersebut.

T The existence of economic opportunities in Pontianak City, West Kalimantan, where development in the city can be said to be very rapid because it can be seen from the graph of the business field, where the accommodation sector supports the city's largest economy, the Neo Hotel will be built as a qualified lodging facility, this building consists of 13 floors and built on a land area of ​​± 461,160 in2 with a building height of 42 meters. Judging from the area and function of the building, we need an electrical installation system that is capable, safe, comfortable and in accordance with requirements such as PULL SNI so that people in the building feel safe and comfortable claiming to enjoy the hotel, in terms of approximate electrical installation the total load or power that will be used is around 875,613 Watts, this includes lights, air conditioners, fans, elevators, pumps, and weak electrical currents where the total load is divided between each power panel per floor to per room, then the distribution starts from the main panel of low voltage dei or it can be called low voltage lit tribution panel, where this panel will divide again into sub distribution panels on a few floors and after that it is divided into each floor or each load such as a large load, namely an elevator. and pump. Judging from the total load, it takes a power of 1250 KVA from PLN with a NYY 6 (4x 1 cx240)mm2 + BC 120 mm2 cable conductor then all the results of the calculation of the cable conductor area can be seen on page 78 and all the results regarding the voltage drop can be seen on page 108. •To support the comfort and reliability of this hotel, a power supply other than PLN is prepared, namely a Generator Set of 1200 KVA plus the ATS AMF system so that when the power supply from PLN is dim it will be automatically turned on by the system.