DETAIL KOLEKSI

Penentuan setting rele proteksi pada saluran udara arah ohl 1 150 kv sarulla (ext) s/s di gardu induk silangkitang I langit


Oleh : Anggita Mentari Putri

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2017

Pembimbing 1 : Maula Sukmawidjaja

Pembimbing 2 : Chairul G Irianto

Subyek : Air ducts - Design and construction

Kata Kunci : differential relay, over current relay, short circuit, overhead line, etap 12.6.0.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2017_TA_STE_06213004_Halaman-Judul.pdf
2. 2017_TA_STE_06213004_Lembar-Pengesahan.pdf
3. 2017_TA_STE_06213004_Bab-1_Pendahuluan.pdf
4. 2017_TA_STE_06213004_Bab-2_Tinjauan-Pustaka.pdf
5. 2017_TA_STE_06213004_Bab-3_Sistem-kelistrikan.pdf
6. 2017_TA_STE_06213004_Bab-4_Penentuan-dan-Simulasi.pdf
7. 2017_TA_STE_06213004_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2017_TA_STE_06213004_Daftar-Pustaka.pdf
9. 2017_TA_STE_06213004_Lampiran.pdf

S Saluran udara tegangan tinggi merupakan komponen sistem tenaga listrik yang berperan sangat penting dalam memasok listrik. Untuk menjaga kontinuitas dan keandalan sistem tenaga listrik pada saluran udara, diperlukan suatu sistem proteksi yang dapat bekerja secara tepat dalam mengisolasi gangguan. Peralatan proteksi sangat memegang peranan penting untuk mengatasi gangguan yang memenuhi persyaratan sensitif, andal, cepat dan selektif yang semuanya bergantung pada ketepatan pada setting peralatannya. Penelitian ini bertujuan untuk menentukan setting rele proteksi pada Saluran Udara arah OHL 1 150 kV Sarulla (EXT) S/S di Gardu Induk SIL. Dengan arus hubung singkat tiga fasa sebesar 16.1 kA, hasil akhir penentuan setting adalah waktu kerja rele diferensial 0.03 detik, Isi 0.2 pu, 1,2 2 pu, k1 30% dan k2 50% serta TMS rele arus lebih 0.04 detik.

H High-voltage overhead line is a component of electric power system which roles very important in supplying electricity. To maintain the continuity and reliability of electric power system on overhead line, we need a protection system that can work properly in isolating the fault: Protection equipment holds an important role to overcome the faults which fulfilled the requirements of a sensitive, reliable, fast and selective that everything depends on the accuracy of the equipment setting. The purpose of this research to determine protection relay setting on Overhead Line direction OHL 1 150kV Sarulla (EXT) S/S in Silangkitang I Langit Substation. With the three-phase short circuit current is 16.1 kA, the final result of the setting determination is operation time of differential relay 0,03 seconds, Is! 0.2 pu, 1,2 2 pu, k1 30% and k2 50% with TMS of overcurrent relay 0,04 seconds.

Bagaimana Anda menilai Koleksi ini ?