DETAIL KOLEKSI

Rencana pengeringan dan optimasi pompa pada sump alteks PIT tengah di PT Berau Bara Abadi, Berau Kaltim

5.0


Oleh : Ignatius Yoga Oktora

Info Katalog

Nomor Panggil : 646/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Reza Aryanto

Pembimbing 2 : Syamidi Patian

Subyek : Mining - Pump;Mining engineering

Kata Kunci : run off, water seepage, dewatering, pump

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001400051_Halaman-Judul.pdf 16
2. 2019_TA_TB_073001400051_Bab-1.pdf 4
3. 2019_TA_TB_073001400051_Bab-2.pdf -1
4. 2019_TA_TB_073001400051_Bab-3.pdf 5
5. 2019_TA_TB_073001400051_Bab-4.pdf 11
6. 2019_TA_TB_073001400051_Bab-5.pdf
7. 2019_TA_TB_073001400051_Daftar-Pustaka.pdf 1
8. 2019_TA_TB_073001400051_Lampiran.pdf 27

P Pada November 2018, terdapat batubara yang tergenang pada area Pit Tengah Sump Alteks akibat dari tingginya curah hujan dan air rembesan tanah yangberasal dari sungai, sehingga menghambat kegiatan produksi dan perlu segera dikeringkan. Pada bulan Desember sump tersebut direncanakan untuk dilakukan pengeringan, maka kebutuhan akan pompa sangat tinggi pada bulan Desember.Maka perlu dilakukan evaluasi pada sistem penyaliran secara keseluruhan yangbertujuan untuk mengetahui penanganan yang tepat. Dari hasil penelitian inidiketahui debit pompa aktual perusahaan yaitu 459,3 atau 341.763,84m3/bln dengan volume air yang berada didalam sump sebesar 811.252,7 m3/blnmampu dikeringankan selama 74 hari. Oleh karena itu, diperlukan langkah –langkah yang dapat mengeringkan sump dalam waktu maksimal 1 bulan, yaitupengecilan catchment area dan optimalisasi pompa dengan menaikan RPM ke1050. sump Alteks kering dalam waktu kurang dari 1 bulan, dengan perlunyapenambahan unit pompa, dengan waktu pengeringan 28 hari.

I In November 2018, there is coal that inundated Central Pit area on Sump Alteksresult from the high rainfall and ground water seepage originating from theRiver, so as inhibit the production and need to be dried immediately. In Decemberthe sump is planned to be done drying, then the pump will need very high inDecember. Then need to be evaluated on overall penyaliran systems that aim tofind out proper handling. From the results of this research note the actual pumpdebit companies namely 459,3 m 3/h or 341.763,84 m3/mth with a volume of waterthat resides inside the sump of 811.252,7 m3/mth capable dikeringankan for 74days. Therefore, the necessary steps-steps that can dry sump within a maximum ofone month, i.e. diminution catchment area and pump optimization with raise RPMto 1050. Sump Alteks dry in less than one month, with the need for the addition ofunit pum, Sump Alteks dry in less than one month, with the need for the additionof unit pump, with 28 days of drying time.

Bagaimana Anda menilai Koleksi ini ?